检索范围:
排序: 展示方式:
Yajvender Pal VERMA, Ashwani KUMAR
《能源前沿(英文)》 2013年 第7卷 第2期 页码 245-254 doi: 10.1007/s11708-012-0218-6
关键词: frequency regulation fuzzy controller de-regulated power system doubly fed induction generator (DFIG) bilateral contract
Bing WANG, Qingbin CUI, Shuibo ZHANG
《工程管理前沿(英文)》 2019年 第6卷 第2期 页码 239-248 doi: 10.1007/s42524-019-0018-3
关键词: infrastructure development contract design contract reliability guarantee provision contract engineering
《工程管理前沿(英文)》 2024年 第11卷 第1期 页码 50-61 doi: 10.1007/s42524-023-0275-z
关键词: built environment industry digitalization Nigeria smart contract technological revolution
Demand response based congestion management in a mix of pool and bilateral electricity market model
Ashwani KUMAR, Charan SEKHAR
《能源前沿(英文)》 2012年 第6卷 第2期 页码 164-178 doi: 10.1007/s11708-012-0187-9
关键词: bid function congestion management (CM) demand response pool+bilateral electricity market static var compensator (SVC) thyristor controlled series compensator (TCSC)
《工程管理前沿(英文)》 2024年 第11卷 第1期 页码 128-142 doi: 10.1007/s42524-023-0280-2
关键词: job recommendation competition reciprocity interpretability
Collaborative adoption of blockchain technology: A supply chain contract perspective
《工程管理前沿(英文)》 2023年 第10卷 第1期 页码 121-142 doi: 10.1007/s42524-022-0239-8
关键词: blockchain collaborative adoption cost sharing revenue sharing hybrid contract
The Supply Chain Contract Design under Cap-and-Trade Mechanism with Free Riding
Fu-qiang Wang,Jun Liu
《工程管理前沿(英文)》 2015年 第2卷 第3期 页码 277-286 doi: 10.15302/J-FEM-2015049
关键词: carbon emissions reduction free riding supply chain contract design cap-and-trade
合同管理是项目管理的核心——小浪底水利枢纽国际合同管理的经验与体会
张基尧
《中国工程科学》 2011年 第13卷 第4期 页码 54-67
小浪底水利枢纽是治理黄河的重要控制性工程,它以地质复杂、布置困难、技术要求高、管理难度大而得到我国水利水电行业的普遍关注,尤其是由于其全方位实施国际招标,成为我国水利工程第一个全面与国际接轨的项目。小浪底水利枢纽至今已建成并成功运行10年,发挥了巨大的社会、经济和生态效益。小浪底工程建设中三大国际承包联营体隶属的40多个国家和地区的承包商、分包商,与项目业主之间围绕合同管理,呈现出多方利益主体之间的博弈。小浪底建管局依靠各方支持,在团结全体建设者优质高效地建成小浪底工程的同时,妥善处理纷繁复杂的各种合同纠
SU Guanghui, QIU Suizheng, DUAN Feng, XIAO Zejun, HUANG Yanping
《能源前沿(英文)》 2007年 第1卷 第3期 页码 264-272 doi: 10.1007/s11708-007-0037-3
《工程管理前沿(英文)》 2022年 第9卷 第2期 页码 177-195 doi: 10.1007/s42524-021-0184-y
关键词: blockchain construction project smart contract smart payment payment dispute
Prevention of laryngeal webs through endoscopic keel placement for bilateral vocal cord lesions
null
《医学前沿(英文)》 2018年 第12卷 第3期 页码 301-306 doi: 10.1007/s11684-017-0549-0
Transoral microresection for treatment of vocal cord lesions involving the anterior commissure may result in anterior glottic webs. In this study, we retrospectively reviewed 54 patients who underwent microsurgery for bilateral lesions involving the anterior commissure and categorized them into two groups. The keel placement and control groups received endoscopic keel placement and mitomycin C, respectively. During the follow-up of at least 1 year, the laryngeal web formation rate significantly decreased in the keel placement group compared with that in the control group (18.6% versus 54.5%, <0.05). Furthermore, the voice handicap index-10 scores for patients without web formation decreased in both the keel placement and control groups ( <0.0001 and <0.001, respectively). A pseudomembrane covering the vocal cords was detected in 16.3% (7 of 43) cases after keel removal. A total of 100% (7 of 7) of these cases and 2.8% (1 of 36) of the other cases formed laryngeal webs ( <0.0001). Endoscopic keel placement could be an effective method for preventing anterior glottic webs after surgery for bilateral vocal cord diseases involving the anterior commissure. The pseudomembrane observed at the time of keel removal may imply a high risk of web formation.
关键词: glottic stenosis glottic web laryngeal keel silastic sheets anterior commissure
刘正光
《中国工程科学》 2012年 第14卷 第12期 页码 81-84
随着社会的发展,工程行业变得十分复杂,因而传统的施工合同已经不能满足工程界日益多元化的发展。因此,英国土木工程师学会和业界经过广泛研究和讨论,一致同意要改善业界互相监视和不信任的现状,因而在1993年,推出新工程合同(NEC), 鼓励成立“团体精神”,即建立良好伙伴关系。经过近20年的应用,NEC成效卓越。香港特区政府也在2009年跟进,试验性地引用NEC。文章介绍了第一个引用NEC项目的经验,该项目成果证明NEC可节省工期和工程费用,减少合同争端,增加成本效益,因而大大增强了业界引用NEC的信心。
Crack propagation with different radius local random damage based on peridynamic theory
《结构与土木工程前沿(英文)》 2021年 第15卷 第5期 页码 1238-1248 doi: 10.1007/s11709-021-0695-y
《工程管理前沿(英文)》 2023年 第10卷 第1期 页码 5-19 doi: 10.1007/s42524-022-0229-x
关键词: digitalization supply chain resilience robustness collaboration formal contract
标题 作者 时间 类型 操作
Load frequency control in deregulated power system with wind integrated system using fuzzy controller
Yajvender Pal VERMA, Ashwani KUMAR
期刊论文
Evaluation of the contract reliability for alternative infrastructure project delivery: a contract engineering
Bing WANG, Qingbin CUI, Shuibo ZHANG
期刊论文
Smart contract applications in the built environment: How prepared are Nigerian construction stakeholders
期刊论文
Demand response based congestion management in a mix of pool and bilateral electricity market model
Ashwani KUMAR, Charan SEKHAR
期刊论文
A bilateral heterogeneous graph model for interpretable job recommendation considering both reciprocity
期刊论文
The Supply Chain Contract Design under Cap-and-Trade Mechanism with Free Riding
Fu-qiang Wang,Jun Liu
期刊论文
Numerical investigation on the dryout point of annular flow in the upward narrow annuli with bilateral
SU Guanghui, QIU Suizheng, DUAN Feng, XIAO Zejun, HUANG Yanping
期刊论文
Blockchain-based smart contract for smart payment in construction: A focus on the payment freezing and
期刊论文
Prevention of laryngeal webs through endoscopic keel placement for bilateral vocal cord lesions
null
期刊论文