Resource Type

Journal Article 2

Year

2000 2

Keywords

Jinmao Building 1

accelerometer 1

area changeable 1

big-size steel tube pile 1

capacitance 1

changeable integrated auto-moving form system 1

extra-deep slurry wall 1

extra-high building 1

installation of steel structure 1

open ︾

Search scope:

排序: Display mode:

An Area Changeable Capacitive Micro-machined Accelerometer

Li Baoqing,Lu Deren,Wang Weiyuan

Strategic Study of CAE 2000, Volume 2, Issue 2,   Pages 36-40

Abstract:

In this paper, a newly developed accelerometer based on the principle of area changeable capacitance

Keywords: capacitance     accelerometer     area changeable    

Construction Technology of Shanghai Jinmao Building

Ye Keming,Fan Qingguo

Strategic Study of CAE 2000, Volume 2, Issue 10,   Pages 42-49

Abstract:

Shanghai Jinmao building is the 3rd highest building in the world at present. The main building consists of reinforced concrete core wall and exterior structure steel frame. It is rather difficult to construct this edifice in such a poor soil condition in Shanghai. Proceeding from actual facts, Shanghai Construction Groups (SCG) makes efforts to conduct technology innovation, and absorbs advanced experiences domestic and abroad wildly. A unit of unique construction technique and a suitable managing system were developed with the growth of this building. SCG successfully solved a series of construction difficulties including deep-foundation work, mega-columns construction, high - altitude construction and erection, and so on. It only spent 4 years on this building, which set a high-speed record in construction history.

Keywords: extra-deep slurry wall     extra-high building     big-size steel tube pile     installation of steel structure     changeable    

Title Author Date Type Operation

An Area Changeable Capacitive Micro-machined Accelerometer

Li Baoqing,Lu Deren,Wang Weiyuan

Journal Article

Construction Technology of Shanghai Jinmao Building

Ye Keming,Fan Qingguo

Journal Article