Search scope:
排序: Display mode:
Multi-objective optimization for the multi-mode finance-based project scheduling problem
Sameh Al-SHIHABI, Mohammad AlDURGAM
Frontiers of Engineering Management 2020, Volume 7, Issue 2, Pages 223-237 doi: 10.1007/s42524-020-0097-1
Keywords: multi-objective optimization finance-based scheduling multi-mode project scheduling mixed-integer linear
Hybrid genetic algorithm for bi-objective resource-constrained project scheduling
Fikri KUCUKSAYACIGIL, Gündüz ULUSOY
Frontiers of Engineering Management 2020, Volume 7, Issue 3, Pages 426-446 doi: 10.1007/s42524-020-0100-x
Keywords: backward–forward scheduling hybrid bi-objective genetic algorithm injection procedure maximum cash balance multi-objective multi-project multi-mode resource-constrained project scheduling problem
Real-Time Assessment and Diagnosis of Process Operating Performance
Shabnam Sedghi,Biao Huang
Engineering 2017, Volume 3, Issue 2, Pages 214-219 doi: 10.1016/J.ENG.2017.02.004
Keywords: Optimality assessment Probabilistic principal component regression Multi-mode
A Multi-objective Optimization Decision-making Model for Project Time - resource Tradeoff Problem
Wang Xianjia,Wan Zhongping
Strategic Study of CAE 2005, Volume 7, Issue 2, Pages 35-40
In the project scheduling and management, the time-resource tradeoff problem is to seek the objectiveof minimizing the project duration and the total consumed-resources cost under the requirement of theabsolute due date of project, and determine an efficient project scheduling according to some precedenceA new multi-objective optimization decision-making model with time-resource tradeoff problem is proposedwhich objective functions with conflict one another are defined as adaptive and adjustable between the project
Keywords: project scheduling management time-resource tradeoff multiobject decision-making model resource-constrained project scheduling Lagragian relaxation
Satellite scheduling engine: The intelligent solver for future multi-satellite management
Frontiers of Engineering Management 2022, Volume 9, Issue 4, Pages 683-688 doi: 10.1007/s42524-022-0222-4
Muhammad Farhan AUSAF,Liang GAO,Xinyu LI
Frontiers of Mechanical Engineering 2015, Volume 10, Issue 4, Pages 392-404 doi: 10.1007/s11465-015-0353-y
Keywords: integrated process planning and scheduling (IPPS) dispatching rules priority based optimization algorithm multi-objective optimization
Active-reactive power scheduling of integrated electricity-gas network with multi-microgrids
Frontiers in Energy 2023, Volume 17, Issue 2, Pages 251-265 doi: 10.1007/s11708-022-0857-1
Keywords: combined cooling heating and power (CCHP) integrated energy systems (IES) natural gas power distribution system gas distribution system
Energy-aware fuzzy job-shop scheduling for engine remanufacturing at the multi-machine level
Jiali ZHAO, Shitong PENG, Tao LI, Shengping LV, Mengyun LI, Hongchao ZHANG
Frontiers of Mechanical Engineering 2019, Volume 14, Issue 4, Pages 474-488 doi: 10.1007/s11465-019-0560-z
Keywords: remanufacturing scheduling adaptive genetic algorithm energy efficiency sustainable remanufacturing hormone
Shuo ZHU, Hua ZHANG, Zhigang JIANG, Bernard HON
Frontiers of Mechanical Engineering 2020, Volume 15, Issue 2, Pages 338-350 doi: 10.1007/s11465-019-0572-8
Keywords: Low-carbon manufacturing carbon efficiency multi-objective optimization two-stage scheduling job shop
Management Mode and Concrete Construction for the Three Gorges Project
Cao Guangjing
Strategic Study of CAE 2004, Volume 6, Issue 8, Pages 82-85
The Three Gorges Project (TGP) is the largest concrete structure in the current world.The Project, with a total amount of approximately 28 million m3 of concrete, is characterizedThrough a decade of engineering practice, a management mode with the TGP's characteristics has beenDesign, construction and management measures adopted for the concrete works of the Project are discussed
Keywords: Three Gorges Project management mode concrete
Loghman PIRI, Vahidreza GHEZAVATI, Ashkan HAFEZALKOTOB
Frontiers of Engineering Management 2022, Volume 9, Issue 1, Pages 117-134 doi: 10.1007/s42524-020-0115-3
Keywords: project scheduling resource leveling between projects constrained resources game theory Benders decomposition
Planning projects with scarce resources: Yesterday, today and tomorrow’s research challenges
Mario VANHOUCKE
Frontiers of Engineering Management 2018, Volume 5, Issue 2, Pages 133-149 doi: 10.15302/J-FEM-2018088
Keywords: project management project scheduling resource constraints PERT/CPM RCPSP
Jinwen ZHANG, Yumin QIU
Frontiers of Engineering Management 2018, Volume 5, Issue 1, Pages 40-51 doi: 10.15302/J-FEM-2018083
Keywords: Hong Kong-Zhuhai-Macao Bridge project island-tunnel subproject complex integrity complexity degradation the general contracting mode of design-build the design-build consortium
Analysis of synergy degree and its influencing factors in hydropower EPC project management
Jiwei ZHU, Hua GAO, Jiangrui WANG
Frontiers of Engineering Management 2021, Volume 8, Issue 3, Pages 402-411 doi: 10.1007/s42524-020-0098-0
Keywords: hydropower project EPC mode synergy degree model grey relational analysis
Rui ZHAO,Gui-he QIN,Jia-qiao LIU
Frontiers of Information Technology & Electronic Engineering 2016, Volume 17, Issue 4, Pages 375-388 doi: 10.1631/FITEE.1500232
Keywords: FlexRay Real-time applications Rectangle bin packing Schedule optimization Slot multiplexing
Title Author Date Type Operation
Multi-objective optimization for the multi-mode finance-based project scheduling problem
Sameh Al-SHIHABI, Mohammad AlDURGAM
Journal Article
Hybrid genetic algorithm for bi-objective resource-constrained project scheduling
Fikri KUCUKSAYACIGIL, Gündüz ULUSOY
Journal Article
Real-Time Assessment and Diagnosis of Process Operating Performance
Shabnam Sedghi,Biao Huang
Journal Article
A Multi-objective Optimization Decision-making Model for Project Time - resource Tradeoff Problem
Wang Xianjia,Wan Zhongping
Journal Article
Satellite scheduling engine: The intelligent solver for future multi-satellite management
Journal Article
Optimization of multi-objective integrated process planning and scheduling problem using a priority based
Muhammad Farhan AUSAF,Liang GAO,Xinyu LI
Journal Article
Active-reactive power scheduling of integrated electricity-gas network with multi-microgrids
Journal Article
Energy-aware fuzzy job-shop scheduling for engine remanufacturing at the multi-machine level
Jiali ZHAO, Shitong PENG, Tao LI, Shengping LV, Mengyun LI, Hongchao ZHANG
Journal Article
A carbon efficiency upgrading method for mechanical machining based on scheduling optimization strategy
Shuo ZHU, Hua ZHANG, Zhigang JIANG, Bernard HON
Journal Article
Management Mode and Concrete Construction for the Three Gorges Project
Cao Guangjing
Journal Article
Developing a new model for simultaneous scheduling of two grand projects based on game theory and solving
Loghman PIRI, Vahidreza GHEZAVATI, Ashkan HAFEZALKOTOB
Journal Article
Planning projects with scarce resources: Yesterday, today and tomorrow’s research challenges
Mario VANHOUCKE
Journal Article
How does the improved DB mode degrade the complex integrity of infrastructure mega-projects?Evidence from the Hong Kong-Zhuhai-Macao Bridge project in China
Jinwen ZHANG, Yumin QIU
Journal Article
Analysis of synergy degree and its influencing factors in hydropower EPC project management
Jiwei ZHU, Hua GAO, Jiangrui WANG
Journal Article