Statistics and countermeasures of non point source pollution in plain river network of Taihu Basin

Qin Zhong,Geng Qingwei,Zang Guimin

Strategic Study of CAE 2010, Volume 12, Issue 6,   Pages 113-116

Abstract:

Comparing the total pollution load into rivers in 2005 with the one in 2000, the analysis suggests that the percentage of point sources in total kept reducing year by year, and the non-point sources increased significantly, especially total phosphorus (TP) whose amount of pollution from non-point sources have already exceeded that from point sources. The total amount of pollution from non-point sources was almost equal, but its composition changed. The pollution from rural domestic sewage ranks first and the pollution from aquaculture and fields ranks second in the total amount of pollution from non-point sources. Based on the analysis of causes of non-point sources pollution, this essay gives some suggestion on the control of non-point sources pollution in plain river network of Taihu Basin.

Keywords: Taihu Basin     plain river network     non-point sources pollution     contro    

Research on simulation evaluation method based on duration contro-llability of network schedule

Pan Feifei,Wang Renchao and Cao Yonglei

Strategic Study of CAE 2015, Volume 17, Issue 1,   Pages 143-150

Abstract:

As the fact that schedulers usually utilizing resources re-allocation and improving resource-utilization efficiency in coping with project delay caused by risk events,a stochastic simulation evaluation method based on duration controllability of network schedule was put forward. This method took the resource allocation and utilization of margin of the activity as controllable indicators, and considered different constructability of measures reaction to different occur time of risk events. Through the stochastic simulation of each risk events occur time, delay of activity duration and effect of the risk reaction,the distribution of project duration was simulated which was utilized to evaluate the rationality of the network schedule. A case indicates that,compared with traditional simulation evaluation methods such as duration-based and factors-based Monte-Carlo simulation, simulation results of the duration controllability-based is more reasonable.

Keywords: network schedule; stochastic simulation; risk reaction; duration controllability; evaluation    

Title Author Date Type Operation

Statistics and countermeasures of non point source pollution in plain river network of Taihu Basin

Qin Zhong,Geng Qingwei,Zang Guimin

Journal Article

Research on simulation evaluation method based on duration contro-llability of network schedule

Pan Feifei,Wang Renchao and Cao Yonglei

Journal Article