Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Engineering >> 2021, Volume 7, Issue 2 doi: 10.1016/j.eng.2020.07.022

Synergic Effect of Reworking for Imperfect Quality Items with the Integration of Multi-Period Delay-in-Payment and Partial Backordering in Global Supply Chains

a Department of Operations and Supply Chain, NUST Business School, National University of Sciences and Technology, Islamabad 44000, Pakistan
b Department of Industrial Engineering, Yonsei University, Seoul 03722, Republic of Korea
c Department of Management Science, Lahore Garrison University, Lahore 54660, Pakistan

Received: 2019-10-06 Revised: 2020-05-22 Accepted: 2020-07-02 Available online: 2020-10-08

Next Previous

Abstract

In intercontinental trade and economics goods are bought from a global supplier. On occasion, the expected lot may include a fraction of defective items. These imperfect items still have worth and can be sold to customers after repair. It is cost-effective and sustainable to rework such items in nearby repair workshops rather than return them. The reworked items can be returned from the workshop to the buyer when shortages are equal to the quantity of imperfect items. In the meantime, the supplier correspondingly deals a multi-period delay-in-payments strategy with purchaser. The entire profit has been maximized with paybacks for interim financing. This study aims to develop a synergic inventory model to get the most profit by making an allowance for reworking, multi-period delay-in-payments policy, and shortages. The findings of the proposed model augment inventory management performance by monitoring cycle time as well as fraction of phase with optimistic inventory for a supply chain. The results demonstrate that profit is smaller if the permitted period given by supplier to buyer is equal to or greater than the cycle time, and profit is greater if the permitted period is smaller than the cycle time. The algebraic method is engaged to make a closed system optimum solution. The mathematical experiment of this study is constructed to provide management insights and tangible practices.
 

Figures

Fig. 1

Fig. 2

Fig. 3

Fig. 4

Fig. 5

Fig. 6

Fig. 7

Fig. 8

Fig. 9

References

[ 1 ] Mohanty DJ, Kumar RS, Goswami A. Vendor–buyer integrated production– inventory system for imperfect quality item under trade credit finance and variable setup cost. Oper Res 2018;52(4–5):1277–93. link1

[ 2 ] Teng JT. On the economic order quantity under conditions of permissible delay in payments. J Oper Res Soc 2002;53(8):915–8. link1

[ 3 ] Sarkar B, Ahmed W, Choi SB, Tayyab M. Sustainable inventory management for environmental impact through partial backordering and multi-trade-creditperiod. Sustainability 2018;10(12):4761–88. link1

[ 4 ] Ahmed W, Sarkar B. Impact of carbon emissions in a sustainable supply chain management for a second generation biofuel. J Clean Prod 2018;186:807–20. link1

[ 5 ] Bogle IDL. A perspective on smart process manufacturing research challenges for process systems engineers. Engineering 2017;3(2):161–5. link1

[ 6 ] Zhong RY, Xu X, Klotz E, Newman ST. Intelligent manufacturing in the context of industry 4.0: a review. Engineering 2017;3(5):616–30. link1

[ 7 ] Khanna A, Kishore A, Sarkar B, Jaggi CK. Inventory and pricing decisions for imperfect quality items with inspection errors, sales returns, and partial backorders under inflation. Oper Res 2020;54(1):287–306. link1

[ 8 ] Tiwari S, Ahmed W, Sarkar B. Multi-item sustainable green production system under trade-credit and partial backordering. J Clean Prod 2018;204:82–95. link1

[ 9 ] Harris FW. How many parts to make at once. Mag Manage 1913;10:135–6. link1

[10] Khan M, Jaber M, Guiffrida A, Zolfaghari S. A review of the extensions of a modified EOQ model for imperfect quality items. Int J Prod Econ 2011;132 (1):1–12. link1

[11] Goyal SK. Economic order quantity under conditions of permissible delay in payments. J Oper Res Soc 1985;36(4):335–8. link1

[12] Porteus EL. Optimal lot sizing, process quality improvement and setup cost reduction. Oper Res 1986;34(1):137–44. link1

[13] Rosenblatt MJ, Lee HL. Economic production cycles with imperfect production processes. IIE Trans 1986;18(1):48–55. link1

[14] Salameh M, Jaber M. Economic production quantity model for items with imperfect quality. Int J Prod Econ 2000;64(1–3):59–64. link1

[15] Roy MD, Sana SS, Chaudhuri K. An economic order quantity model of imperfect quality items with partial backlogging. Int J Syst Sci 2011;42(8):1409–19. link1

[16] Eroglu A, Ozdemir G. An economic order quantity model with defective items and shortages. Int J Prod Econ 2007;106(2):544–9. link1

[17] Sarkar B, Cárdenas-Barrón LE, Sarkar M, Singgih ML. An economic production quantity model with random defective rate, rework process and backorders for a single stage production system. J Manuf Syst 2014;33(3):423–35. link1

[18] Sarkar B, Saren S. Product inspection policy for an imperfect production system with inspection errors and warranty cost. Eur J Oper Res 2016;248 (1):263–71. link1

[19] Jaber MY, Zanoni S, Zavanella LE. Economic order quantity models for imperfect items with buy and repair options. Int J Prod Econ 2014;155:126–31. link1

[20] Lashgari M, Taleizadeh AA, Ahmadi A. Partial up-stream advanced payment and partial down-stream delayed payment in a three-level supply chain. Ann Oper Res 2016;238(1–2):329–54. link1

[21] Sarkar B, Shaw BK, Kim T, Sarkar M, Shin D. An integrated inventory model with variable transportation cost, two-stage inspection, and defective items. J Ind Manage Optim 2017;13:1975–90. link1

[22] Ahmed W, Sarkar B. Management of next-generation energy using a triple bottom line approach under a supply chain framework. Resour Conserv Recycling 2019;150:104431. link1

[23] Kim MS, Sarkar B. Multi-stage cleaner production process with quality improvement and lead time dependent ordering cost. J Clean Prod 2017;144:572–90. link1

[24] Zhou J, Li P, Zhou Y, Wang B, Zang J, Meng L. Toward new-generation intelligent manufacturing. Engineering 2018;4(1):11–20. link1

[25] Zhou Y, Zang J, Miao Z, Minshall T. Upgrading pathways of intelligent manufacturing in China: transitioning across technological paradigms. Engineering 2019;5(4):691–701. link1

[26] Tiwari S, Daryanto Y, Wee HM. Sustainable inventory management with deteriorating and imperfect quality items considering carbon emission. J Clean Prod 2018;192:281–92. link1

[27] Taheri-Tolgari J, Mohammadi M, Naderi B, Arshadi-Khamseh A, Mirzazadeh A. An inventory model with imperfect item, inspection errors, preventive maintenance and partial backlogging in uncertainty environment. J Ind Manage Optim 2019;15:1317–44. link1

[28] Tayyab M, Sarkar B, Yahya B. Imperfect multi-stage lean manufacturing system with rework under fuzzy demand. Mathematics 2019;7(1):13–30. link1

[29] Wook Kang C, Ullah M, Sarkar M, Omair M, Sarkar B. A single-stage manufacturing model with imperfect items, inspections, rework, and planned backorders. Mathematics 2019;7(5):446–63. link1

[30] Dey BK, Sarkar B, Pareek S. A two-echelon supply chain management with setup time and cost reduction, quality improvement and variable production rate. Mathematics 2019;7(4):328–52. link1

[31] Soni H, Shah NH. Optimal ordering policy for stock-dependent demand under progressive payment scheme. Eur J Oper Res 2008;184(1):91–100. link1

[32] Sarkar B, Ahmed W, Kim N. Joint effects of variable carbon emission cost and multi-delay-in-payments under single-setup-multiple-delivery policy in a global sustainable supply chain. J Clean Prod 2018;185:421–45. link1

[33] Yang M, Tseng WC. Three-echelon inventory model with permissible delay in payments under controllable lead time and backorder consideration. Math Probl Eng 2014;2014:1–16. link1

[34] Taleizadeh AA, Lashgari M, Akram R, Heydari J. Imperfect economic production quantity model with upstream trade credit periods linked to raw material order quantity and downstream trade credit periods. Appl Math Model 2016;40(19–20):8777–93. link1

[35] Tiwari S, Ahmed W, Sarkar B. Sustainable ordering policies for noninstantaneous deteriorating items under carbon emission and multi-tradecredit-policies. J Clean Prod 2019;240:118183. link1

[36] Taleizadeh AA, Sarkar B, Hasani M. Delayed payment policy in multi-product single-machine economic production quantity model with repair failure and partial backordering. J Ind Manage Optim 2020;16:1684–8. link1

[37] Lashgari M, Taleizadeh AA, Sadjadi SJ. Ordering policies for non-instantaneous deteriorating items under hybrid partial prepayment, partial trade credit and partial backordering. J Oper Res Soc 2018;69(8):1167–96. link1

[38] Zia NP, Taleizadeh AA. A lot-sizing model with backordering under hybrid linked-to-order multiple advance payments and delayed payment. Transp Res Part E Logist Trans Rev 2015;82:19–37. link1

[39] Lashgari M, Taleizadeh AA, Sana SS. An inventory control problem for deteriorating items with back-ordering and financial considerations under two levels of trade credit linked to order quantity. J Ind Manage Optim 2016;12(3):1091–119. link1

[40] Papachristos S, Konstantaras I. Economic ordering quantity models for items with imperfect quality. Int J Prod Econ 2006;100(1):148–54. link1

[41] Soni HN, Patel KA. Optimal strategy for an integrated inventory system involving variable production and defective items under retailer partial trade credit policy. Decis Support Syst 2012;54(1):235–47. link1

[42] Daryanto Y, Wee HM, Widyadana GA. Low carbon supply chain coordination for imperfect quality deteriorating items. Mathematics 2019;7 (3):234–57. link1

[43] Taleizadeh AA, Khanbaglo MPS, Cárdenas-Barrón LE. Replenishment of imperfect items in an EOQ inventory model with partial backordering. Oper Res 2020;54(2):413–34. link1

[44] Taleizadeh AA, Khanbaglo MPS, Cárdenas-Barrón LE. An EOQ inventory model with partial backordering and reparation of imperfect products. Int J Prod Econ 2016;182:418–34. link1

[45] Ahmed W, Sarkar B, Ullah M. Impact of reparation for imperfect quality items having shortages in the system under multi-trade-credit-period. DJ J Eng Appl Math 2018;5(1):1–16. link1

[46] Taleizadeh AA, Zarei HR, Sarker BR. An optimal ordering and replenishment policy for a vendor–buyer system under varying replenishment intervals and delayed payment. Eur J Ind Eng 2019;13(2):264–98. link1

Related Research