Search scope:
排序: Display mode:
Frontiers of Medicine doi: 10.1007/s11684-023-0983-0
Keywords: mitochondrial fission Ca Berberine alleviates myocardial murine model HFpEF
Biological properties and clinical applications of berberine
Danyang Song, Jianyu Hao, Daiming Fan
Frontiers of Medicine 2020, Volume 14, Issue 5, Pages 564-582 doi: 10.1007/s11684-019-0724-6
Keywords: berberine Coptis chinensis pharmacological properties mechanism clinical applications
A novel cataplasma matrix of traditional Chinese medicine
Jing TIAN, Xiaolei ZHANG, Xueqin ZHOU,
Frontiers of Chemical Science and Engineering 2010, Volume 4, Issue 1, Pages 91-95 doi: 10.1007/s11705-009-0304-4
Keywords: drug-release applicable berberine curcumin different
Zeng Ping,Song Yonghui,Cui Xiaoyu,Duan Liang,Qiu Guanglei,Xiao Shuhu,Ma Yinchen,Shan Yongping
Strategic Study of CAE 2013, Volume 15, Issue 3, Pages 88-94
For the copper-containing berberine wastewater produced by pharmaceuticaloxygen demand (COD) concentration of 60 000~80 000 mg/L, copper concentration of 12 000~18 000 mg/L, berberineconcentration of 1 700~1 900 mg/L, the removal efficiencies of berberine and Cu2+ were higher than 99.0%, and the concentration of berberine and Cu2+ in effluent were lower than 1.0 mg/L and 0.5 mg/L after
Keywords: chemosynthesis pharmaceutical wastewater Fe-C microelectrolysis ion exchange column berberine copper-containing
Lin Qi,Song Yonghui,Li Dong,Zhang Jie
Strategic Study of CAE 2013, Volume 15, Issue 3, Pages 95-102
The wastewater treatment plant based on biological aerated filter faces the upgrading reconstruction to achieve the GB code first-level of wastewater discharge. Studies on the advanced treatment process involving chemical phosphorus removal, air-floated oil removal, hydrolysis acidification and the anoxic/oxic biological aerated filter were conducted, the feasibility of the process and the optimal parameters were determined. the feasibility of the process and the optimal parameters were determined. For pre-denitrification, the reflux ratio was 125 %, the hydraulic retention time was 20 min. The cost of construction and operation were calculated. The theoretical evidence and database can be used to the reference for the upgrading reconstruction of the similar wastewater treatment plant.
Keywords: industrial combined wastewater wastewater treatment plant biological aerated filter upgrading reconstruction
Title Author Date Type Operation
Berberine alleviates myocardial diastolic dysfunction by modulating Drp1-mediated mitochondrial fission
Journal Article
Biological properties and clinical applications of berberine
Danyang Song, Jianyu Hao, Daiming Fan
Journal Article
A novel cataplasma matrix of traditional Chinese medicine
Jing TIAN, Xiaolei ZHANG, Xueqin ZHOU,
Journal Article
Pretreatment and copper recovery from chemosynthesis copper-containing berberine wastewater by Fe-C microelectrolysis
Zeng Ping,Song Yonghui,Cui Xiaoyu,Duan Liang,Qiu Guanglei,Xiao Shuhu,Ma Yinchen,Shan Yongping
Journal Article