Search scope:
排序: Display mode:
Investigation into viability of using two-stage (pre-placed aggregate) concrete in Irish setting
John O’MALLEY, Hakim S. ABDELGADER,
Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 1, Pages 127-132 doi: 10.1007/s11709-010-0007-4
Keywords: grout pre-placed concrete two-stage concrete (TSC)
Frontiers of Structural and Civil Engineering Pages 1145-1162 doi: 10.1007/s11709-023-0945-2
Keywords: seismic resilience self-centering rubber layer flag-shaped hysteresis loop parametric study
Effect of interface adhesion factor on the bearing capacity of strip footing placed on cohesive soil
Frontiers of Structural and Civil Engineering 2021, Volume 15, Issue 6, Pages 1494-1503 doi: 10.1007/s11709-021-0768-y
Keywords: bearing capacity soil-rock interface Hoek−Brown yield criterion plasticity limit analysis
Siu-Lai CHAN, Yaopeng LIU, Andy LEE,
Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 3, Pages 376-382 doi: 10.1007/s11709-010-0086-2
Keywords: tension system glass wall nonlinear analysis pre-tensioning second-order analysis
A pre-compensation method of the systematic contouring error for repetitive command paths
D. L. ZHANG,Y. H. CHEN,Y. P. CHEN
Frontiers of Mechanical Engineering 2015, Volume 10, Issue 4, Pages 367-372 doi: 10.1007/s11465-015-0367-5
For a repetitive command path, pre-compensating the contouring error by modifying the command pathTo obtain the pre-compensation value with better accuracy, this paper proposes the use of a back propagationFurthermore, by using the extracted function, the contouring error can be easily pre-compensated.
Keywords: contouring error pre-compensation motion control system back propagation (BP) neural network
Frontiers of Structural and Civil Engineering 2023, Volume 17, Issue 3, Pages 411-428 doi: 10.1007/s11709-023-0928-3
Keywords: pre-stressed concrete sleeper ultrahigh performance fiber-reinforced concrete pull-out test static
Weihua Zhao, Meixiang Wang, Jianwei Li, Yu Huang, Baikun Li, Cong Pan, Xiyao Li, Yongzhen Peng
Frontiers of Environmental Science & Engineering 2018, Volume 12, Issue 5, doi: 10.1007/s11783-018-1084-1
A novel two sludge pre-A2NSBR system was developed.
Keywords: Denitrifying phosphorus removal C/N ratio Nitrate recycling Carbon source type Biological nutrient removal Pre-A
Ali Fadhil NASER, Zonglin WANG
Frontiers of Structural and Civil Engineering 2013, Volume 7, Issue 2, Pages 164-177 doi: 10.1007/s11709-013-0196-8
Keywords: structural performance steel plates external pre-stressing cracks grouting method static
Techno-economic comparison of three technologies for pre-combustion CO
Simon Roussanaly, Monika Vitvarova, Rahul Anantharaman, David Berstad, Brede Hagen, Jana Jakobsen, Vaclav Novotny, Geir Skaugen
Frontiers of Chemical Science and Engineering 2020, Volume 14, Issue 3, Pages 436-452 doi: 10.1007/s11705-019-1870-8
Keywords: carbon capture and storage (CCS) techno-economic comparison pre-combustion capture physical solvent low-temperature
Mohammed FARUQI, Oved I. MATA, Francisco AGUINIGA
Frontiers of Structural and Civil Engineering 2018, Volume 12, Issue 3, Pages 352-360 doi: 10.1007/s11709-017-0453-3
Concrete members historically have used either pre-stressed steel or steel bars.However, the flexure behavior of a hybrid system reinforced by the combination of pre-stressed steelTwo slabs of 100 and 150-millimeter thickness, with a span of 2.1 m reinforced with both pre-stressingThe theoretical slabs were either reinforced with pre-stressed steel or GFRP rebars, or a hybrid system
Keywords: Partial pre-stressing composite structures GFRP bars
Hailin WANG
Frontiers in Energy 2019, Volume 13, Issue 3, Pages 571-578 doi: 10.1007/s11708-019-0640-0
Keywords: China’s National Determined Contribution emission reduction potential scenario analysis CO2 emissions peak
Virtual pre-assembly for large steel structures based on BIM, PLP algorithm, and 3D measurement
Ying ZHOU, Wan WANG, Hanbin LUO, Yan ZHANG
Frontiers of Engineering Management 2019, Volume 6, Issue 2, Pages 207-220 doi: 10.1007/s42524-019-0016-5
Keywords: steel structure pre-assembly BIM plane-line-point 3D measurement
Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault
Xiao YAN, Zizheng SUN, Shucai LI, Rentai LIU, Qingsong ZHANG, Yiming ZHANG
Frontiers of Structural and Civil Engineering 2019, Volume 13, Issue 6, Pages 1393-1404 doi: 10.1007/s11709-019-0563-1
Keywords: pre-grouting stability analysis factor of safety discontinuity layout optimization
WU Xuelei, CHEN Lunqiang, PENG Yongzhen, WANG Pu, WANG Yayi
Frontiers of Environmental Science & Engineering 2008, Volume 2, Issue 2, Pages 236-240 doi: 10.1007/s11783-008-0008-x
Xiang LI, Wenzheng ZHANG, Zhong HUANG, Dehao JU, Li HUANG, Mingzhi FENG, Xingcai LU, Zhen HUANG
Frontiers in Energy 2019, Volume 13, Issue 3, Pages 483-493 doi: 10.1007/s11708-019-0631-1
Keywords: marine engine natural gas methane turbulent jet ignition (TJI) pre-chamber
Title Author Date Type Operation
Investigation into viability of using two-stage (pre-placed aggregate) concrete in Irish setting
John O’MALLEY, Hakim S. ABDELGADER,
Journal Article
Parametric study on seismic performance of self-centering reinforced concrete column with bottom-placed
Journal Article
Effect of interface adhesion factor on the bearing capacity of strip footing placed on cohesive soil
Journal Article
Nonlinear analysis of pre-tensioned glass wall facade by stability function with initial imperfection
Siu-Lai CHAN, Yaopeng LIU, Andy LEE,
Journal Article
A pre-compensation method of the systematic contouring error for repetitive command paths
D. L. ZHANG,Y. H. CHEN,Y. P. CHEN
Journal Article
Experimental and parametrical investigation of pre-stressed ultrahigh-performance fiber-reinforced concrete
Journal Article
Optimization of denitrifying phosphorus removal in a pre-denitrification anaerobic/anoxic/post-aeration+ nitrification sequence batch reactor (pre-A
Weihua Zhao, Meixiang Wang, Jianwei Li, Yu Huang, Baikun Li, Cong Pan, Xiyao Li, Yongzhen Peng
Journal Article
Evaluation of the static and dynamic structural performance of segmental pre-stressed concrete box girder
Ali Fadhil NASER, Zonglin WANG
Journal Article
Techno-economic comparison of three technologies for pre-combustion CO
Simon Roussanaly, Monika Vitvarova, Rahul Anantharaman, David Berstad, Brede Hagen, Jana Jakobsen, Vaclav Novotny, Geir Skaugen
Journal Article
Hybrid flexural components: Testing pre-stressed steel and GFRP bars together as reinforcement for flexural
Mohammed FARUQI, Oved I. MATA, Francisco AGUINIGA
Journal Article
Virtual pre-assembly for large steel structures based on BIM, PLP algorithm, and 3D measurement
Ying ZHOU, Wan WANG, Hanbin LUO, Yan ZHANG
Journal Article
Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault
Xiao YAN, Zizheng SUN, Shucai LI, Rentai LIU, Qingsong ZHANG, Yiming ZHANG
Journal Article
Experimental study of nitrite accumulation in pre-denitrification biological nitrogen removal process
WU Xuelei, CHEN Lunqiang, PENG Yongzhen, WANG Pu, WANG Yayi
Journal Article