Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2000, Volume 2, Issue 11

The Application of Box Floor as Submerged Camel to Hydraulic Btructures Being Constructed

Water Resource Bureau of Jiangsu Province , Nanjing 210029, China

Received: 2000-07-17 Available online: 2000-11-20

Next Previous

Abstract

In this paper, the application of box floor as submerged camel to hydraulics structures being constructed ,such as sluice gates only temporarily adjusted, water works in the place where the streams being intersected, locks with broad chamber , etc. , is introduced. The sites of these structures are to be on a straight stretch where the diverting of the rivers are not permitted and the widths of chambers of them are equal to the river bed.

The concrete of the chamber and the embedded parts of the chamber as will as the gates with their hoist are completed in a yards where they are prefabricated. The chamber is moved in submerged state to the site. These hydraulic structures are cheaper than those that are constructed in dry sites with the diversion works.

Figures

图1

图2

References

[ 1 ] 孙更生 , 郑大同主编 .软土工程与地下工程 [M ].北京 :中国建筑工业出版社 , 1 984 670~ 70 1 link1

[ 2 ] 林宝玉 , 吴绍章 .混凝土工程新材料设计与施工[M ].北京 :中国水利水电出版社 , 1 998. 1 8~ 2 0 , 1 41~ 1 63 link1

[ 3 ] 戴立明 水下薄层混凝土施工 [J].江苏水利 , 1 999, 9:2 4~ 2 7 link1

[ 4 ] 胡金全 , 顾强生 .黄沙港反拱底板水下修补试验研究 [J].江苏水利 , 1 999, 9:2 8~ 2 9 link1

[ 5 ] 徐惠亮 , 周灿华 , 蔡平 .气压沉柜的应用 [J].江苏水利 , 1 998增刊 :2 3~ 2 5 link1

Related Research