Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2001, Volume 3, Issue 1

The Post Occupancy Evaluation for the Auditorium of Shanghai Grand Theater

School of Architecture, Tsinghua University, Beijing 100084, China

Received: 2000-06-29 Available online: 2001-01-20

Next Previous

Abstract

The contemporary Grand Theater of international level in China was first built in Shanghai. The author has done a lot of work on the post occupancy evaluation for this theater. This paper is only a part of their researches, focussing their attention on briefly introducing the design intentions of the auditorium in terms of technological aspect, such as sight-line design, noise level control, acoustic design, the collected acoustic parameters measured from different points within the auditorium as well as the removable sound canopy and the alternative reverberation adjustable devices, etc. also quoting Important comments on the sound effects of the auditorium by both domestic and international famous experts in the theatrical and music circle and the evaluation scores by ordinary audiences from every aspects of users point of view are given.

Figures

图1

图2

图3

图4

图5

图6

References

[ 1 ] 华东建筑设计研究院 上海大剧院建筑施工图 , 1995

[ 2 ] 章奎生 上海大剧院观众厅的音质设计与研究 上海现代建筑设计 (集团 ) 有限公司技术简报 , 1999, (3)

Related Research