Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2009, Volume 11, Issue 1

Bridge engineering construction and technical innovation in the section between Beijing and Cangzhou in Beijing-Shanghai high-speed railway

China Railway 17th Bureau Group Co.,Ltd, Taiyuan 030006, China

Received: 2008-10-25 Available online: 2009-01-12 10:29:43.000

Next Previous

Abstract

According to the features of bridges in the section between Beijing and Cangzhou in Beijing-Shanghai high-speed railway, the construction and technical innovations which include special representative structure of bridges, control measures on settlement after the completion of bridges in the regional land subsidence area and assurance methods on high track regularity of ballastless track in 350 km/h speed are mainly introduced.

Figures

图1

图2

图3

图4

图5

图6

图7

Related Research