Strategic Study of CAE >> 2009, Volume 11, Issue 7

Study on key construction technologies of Xiamen Xiang’an subsea tunnel

1. Tunnel and Underground Engineering Research Center of Ministry of Education, Beijing Jiaotong University, Beijing 100044, China;

2. Xiang'an Subsea Tunnel Project in Xiamen, China Railway 22th Bureau Group Co., Ltd., Xiamen, Fujian 361102, China

Received: 2009-04-10 Available online: 2009-07-10 15:11:57.000

Next Previous

Abstract

Xiamen Xiang'an subsea tunnel is the first subsea tunnel in China, whose geological conditions in the land are strongly weathered granite with enriched groundwater, shallow-buried excavation method is adopted. During the tunnel construction, the deformation of tunnel support is great. It is important to seek for a reasonable countermeasure to restrict the large deformation to ensure safety construction and advance through trials in locale. The arch crown settlement and level convergence are controlled effectively. Its subsea geological condition is granite.Drilling hole and blasting parameters trials are carried out through construction, and better blasting plan and parameters are gained. The ranges of rock crash of the tunnels are measured by using ultrasonic instrument and displacement record.

Figures

图1

图2

图3

图4

图5

图6

References

[ 1 ] 王梦恕.地下工程浅埋暗挖技术通论[M].合肥:安徽教育出版社,2004

[ 2 ] 曾超.大断面海底隧道异常变形控制措施[J].岩石力学与工程学报,2007,26(11):2170-2175 link1

[ 3 ] 赵源林,姜玉松.既有铁路路基下软岩隧道的CRD法施工技术[J].安徽理工大学学报(自然科学版),2005,25(2):29-34 link1

[ 4 ] 徐林生,孙钧,蒋树屏.洋碰隧道CRD工法过程的动态仿真数值模拟研究[J].地质灾害与环境保护,2001,12(1):58-67 link1

[ 5 ] 张建国,王明年,刘大刚,等.海底隧道浅埋暗挖段CRD法不同施工工序比较[J].岩石力学与工程学报,2007,26(supp.2):3639-3645 link1

[ 6 ] 黄明琦,付贤伦,李云超.大断面海底隧道软弱地层CRD法施工稳定性控制研究[J].岩石力学与工程学报,2007,26(supp.2):3804-3809 link1

[ 7 ] 张建斌.厦门翔安海底隧道陆域地段CRD法位移检测分析[J].岩石力学与工程学报,2007,26(supp.2):3653-3658

Related Research