Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2009, Volume 11, Issue 10

Study on innovation technique of train bogie at high speed

State Key Laboratory of Traction Power, Southwest Jiaotong University, Chengdu 610031, China

Funding project:国家“九七三”计划项目(2007CB714700);国家自然科学杰出青年基金(50525518) Received: 2009-08-15 Available online: 2009-10-12 14:03:22.000

Next Previous

Abstract

The present work gives an introduction to the framework of development of high speed trains and the study on its innovation techniques in China. In the framework, the further researches were carried out on the profile and back-distance of high speed wheelset, the irregularity spectrum of high speed track, and the suspension parameters of high speed EMU in order to find their best adaptabilities when the vehicles run at the existing line. The structure parameters of the high speed EMU, which now serves in Beijing—Tianjin intercity high speed line, were in detail optimized and their hunting critical speed increases significantly. Therefore, the vehicles meet their service operation at higher speeds. The maximum test speed of this kind of the high speed vehicle on Beijing—Tianjin high speed line reached 394.3 km/h, and the vehicle represent excellent dynamic behavior. Aimed at a new generation of high speed trains with higher service speed, which will serves on Beijing—Shanghai high speed railway line, the characteristics of the non-ballasted track, and the service operation requirement of the vehicles, the vertical dynamic characteristics of the vehicle used now in Beijing—Tianjin line were further improved and optimized without loss of its critical hunting speed. The lateral and vertical dynamics behaviors and motion stability increase distinctly. The procedure regarding the import, assimilation and absorption, and innovation of high speed train techniques has been successfully accomplished.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

图10

图11

图12

图13

图14

图15

图16

图17

图18

图19

图20

图21

图22

图23

图24

图25

References

[ 1 ] 张曙光.高速列车设计方法研究[ M] .北京:中国 铁道出 版社 出版,2008

[ 2 ] 张卫华.机车车辆动态模拟[ M] .北京:中国铁道出版社出版, 2006

[ 3 ] 张卫华,陈建政,黄丽湘.车辆参数测定方法的研究[ J] .铁道 车辆,2000 ,38 ( 12 ) :1 -4 link1

[ 4 ] Zhang Shuguang, Zhang Weihua, Jin Xuesong.Dynamics of high speed wheel /rail system and its modelling [ J ] .Chinese Science Bulletin,2007 ,52 ( 11 ) :1566 -1575 link1

[ 5 ] 张卫华,张曙光.高速列车耦合大系统动力学及服役模拟[J].西南交通大学学报,43(2):147-153 link1

[ 6 ] 罗林.高速铁路轨道必须具有高平顺性[J].中国铁路,2000,(10):8-11 link1

[ 7 ] 张曙光.铁路高速列车应用基础理论与工程技术[M].北京:科学出版社,2007

[ 8 ] TB/T3115-2005.铁道机车车辆动力学性能台架试验方法[S].北京:中国铁道出版社出版,2005

Related Research