Strategic Study of CAE >> 2009, Volume 11, Issue 12
Construction geology technology of Karst tunnels on Yichang-Wanzhou Railway
Yichang-Wanzhou Railway Construction Headquarters of Ministry of Railways, Enshi, Hubei 445000, China
Next Previous
Abstract
Taking the construction geology technology practice of karst tunnels on Yichang-Wuanzhou Railway as an example, construction geology, which is a continuation of engineering geological exploration in construction stage, can be used to solve the problems which do not exist or cannot be solved in exploration stage. Taking advanced geology predication as its subject, aiming at avoiding large-scale construction geological harzards, construction geology refers to the comprehensive engineering geology work for ensuring construction progress, construction safety, engineering benefit and project quality, such as predicting possible displacement of tunnel surrounding rock; forecasting potential salt cavities, faults and underground rivers; finding out potential hydrogeology problems and concealed geological disasters after project completion, etc. Construction geology includes comprehensive advanced geology predication, hydrogeological observation and concealed karst exploration.
Keywords
Yichang-Wanzhou Railway ; comprehensive advanced geology predication ; hydrological monitoring
References
[ 1 ] 刘招伟,张民庆,王树仁.岩溶隧道灾变预测与处治技术[M].北京:科学出版社,2007
[ 2 ] 何发亮,李苍松,陈成泉.隧道地质超前预报[M].成都:西南交通大学出版社,2006