Treatment techniques for Karst disaster of Maluqing Tunnel on Yichang-Wanzhou Railway
1. The 11th Railway Engineer Bureau Ltd., Wuhan 430071, China;
2. Ministry of Railways P.R.C, Beijing 100866, China
Next Previous
Abstract
Karst disaster is badly endangering the safety of tunnel construction and impedes the construction schedule seriously. In present, it is an important and difficult problem in tunnel construction all over the world. The feature of karst water burst in Maluqing Tunnel is analyzed first, and then advanced geological forecasting technology, hydrological observation, reverse slope drainage technology and water release technology in the treatment for the +978 Karst cave are introduced separately; what is more, disclosure progress and the status after disclosing of the +978 Karst cave are depicted detailedly. Finally, curtain grouting technology for stratum consolidation and pile-cap technology for spanning karst cave after the +978 Karst Cave disclosed are introduced too. Successful experience for the karst treatment in Maluqing Tunnel will provide a reference to the treatment for karst cave with large quantity water during the similar tunnel construction in the future.
Keywords
tunnel ; Karst water burst ; advanced geological forecast ; curtain grouting
References
[ 1 ] 铁道第四勘察设计院宜万铁路建设指挥部.宜万线重点岩溶隧道专家组现场调研—地质汇报材料[R].武汉:铁道第四勘察设计院,2006:1-2,82-84
[ 2 ] 铁道部工程管理中心.宜万铁路马鹿箐隧道工程技术方案论证会[R].北京,2008
[ 3 ] 铁道第四勘察设计院.宜万铁路宜昌至万州段新建工程施工图—马鹿箐隧道设计图[R].武汉,2004