Strategic Study of CAE >> 2009, Volume 11, Issue 12

The processing technology of Longlin Temple Tunnel through a large cavern

Yichang-Wanzhou Railway Construction Headquarters of Ministry of Railways, Enshi, Hubei 445000, China

Received: 2009-10-29 Available online: 2009-12-15 09:10:51.000

Next Previous

Abstract

Longlin Temple Tunnel is one of the 26 risk II tunnels on Yichang-Wanzhou Railway. The whole tunnel locates in limestone strata, and the standard height of the whole tunnel is through a vertical seepage zone. In construction process, several large caverns were revealed, whose karst and development characteristics were introduced, and the processing methods of two super-large karsts were discussed. DK232+467 is the biggest cavern in the construction history of China railways, and cavern protection and construction are extremely difficult. Subgrade filling and opencut tunnel were adopted. The large span roof of DK231+796 cavern is very difficult to process and its construction risk is high. Supporting columns were creatively used to support cavern roof. The successfully processing experience of the two super-large caverns will provide reference for similar projects.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

图10

图11

图12