Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2011, Volume 13, Issue 10

Closure technique for the hybrid girder cable-stayed bridge of Edong Bridge

1.CCCC Highway Planning and Design Consultants Co.,Ltd., Beijing 100088 China;

2.Civil Engineering Institute, Southwest Jiaotong University, Chengdu 610031, China

Received: 2010-11-04 Available online: 2011-10-19 09:16:15.000

Next Previous

Abstract

Based on Edong Bridge, which is the second longest hybrid girder cable-stayed bridge with 926 m long main span,the influencing factors and crucial techniques of the main span closure method for long span hybrid girder cable-stayed bridge are studied. After theoretical analysis, numerical evaluation and practical test, the loading assistant closure method is employed in Edong Bridge. The loading assistant closure method, with better thermal adaptability and less influence on bridge line and the forced status,can meet the requirements of the unstressed state control method. Based on the mentioned advantages,the loading assistant closure method is applicable to long span hybrid girder cable-stayed bridges. The conclusion can provide reference for the further design of the similar bridges.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

References

[ 1 ] 刘明虎.大跨宽幅混合梁斜拉桥关键技术设计综述[C]//中国公路学会桥梁和结构工程分会2009年全国桥梁学术会议论文集.北京:人民交通出版社,2009.

[ 2 ] 梁鹏,肖汝诚,徐岳.超大跨度斜拉桥的安装构形与无应力构形[J].长安大学学报,2006,26(4):49-53. link1

[ 3 ] 秦顺全.分阶段施工桥梁的无应力状态控制法[J].桥梁建设,2008(1):8-14. link1

[ 4 ] 李乔,卜一之,张清华.基于几何控制的全过程自适应施工控制系统研究[J].土木工程学报,2009(7):69-77. link1

[ 5 ] 芳文,赵雷.大跨度斜拉桥施工力学行为参数敏感性分析[J].兰州理工大学学报,2009(6):124-130. link1

[ 6 ] 陈鸣,罗承斌,吴启和,等.苏通大桥主桥中跨顶推辅助合龙技术[J].中国工程科学,2009,11(3):75-80. link1

[ 7 ] 东辉,覃勇刚.南京大胜关长江大桥钢梁架设及关键技术[J].桥梁建设,2009(3):5-8. link1

Related Research