Research on construction optimization of asymmetric double arch section in Jiaozhou Bay Subsea Tunnel

Tunnel and Underground Engineering Research Center of Ministry of Education,Beijing Jiaotong University,Beijing 100044,China

Funding project:国家自然科学基金资助项目(51008015);北京市科技新星计划项目(2009B14);北京交通大学基本科研业务费项目(2009JBZ016-2) Received: 2011-03-05 Available online: 2012-01-06 15:27:14.000

Next Previous

Abstract

Aiming at the asymmetric double-arch tunnel engineering that lies at Jiaozhou Bay in Qingdao, the section located in the intersection between main tunnel and ramb tunnel is chosen as a typical cross section and a three-dimensional model for numerical analysis. Four construction schemes are constituted according to different construction sequences and different digging lengths. Then these schemes are simulated with FLAC3D program. By analyzing ground surface settlement, vault settlement values, displacement of supporting structure, principle stress in surrounding rock, as well as principle stress in supporting structure, the most disadvantage position of structural deformation and stress during construction is determined. It concludes that the surrounding rock deformation could be better controlled by using of the construction sequence that first middle drift and then right hole of ramb tunnel, and the reasonable construction scheme is suggested.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

图10

图11

图12

图13

图14

图15

References

[ 1 ] 重庆交通科研设计院,JTGD70-2004公路隧道设计规范[S].北京:人民交通出版社.2004.

[ 2 ] 李术才,朱维申,陈卫忠,等.弹塑性大位移有限元方法在软岩隧道变形预估系统研究中的应用[J].岩石力学与工程学报,2002,21(4):267-271. link1

[ 3 ] 朱维申,王平.动态规划原理在洞室群施工力学中的应用[J].岩石力学与工程学报,1992.11(4):323-33l. link1

[ 4 ] 王明年,李志业,关宝树.3孔小间距浅埋暗挖隧道地表沉降控制技术研究[J].岩土力学,2002.23(6):821-824. link1

Related Research