Strategic Study of CAE >> 2011, Volume 13, Issue 11
Key technology of concrete headframe construction in alpine areas
China Coal No.72 Engineering Division,Suzhou,Anhui 234000, China
Next Previous
Abstract
During the reinforced concrete headframe construction in alpine areas in Northwest China, by the research and application of rapid thawing technology in pile foundation range and rapid headframe construction technology in winter, the project quality can be ensured; the construction speed of headframe pile foundation and headframe body in winter was accelerated; the time of headframe construction was shortened and the bottleneck problems of coal mine construction in alpine areas were solved.
Keywords
alpine areas in Northwest China ; reinforced concrete headframe ; artificial frost-thawed soil ; quick freezing ; in winter ; tower rapid construction technology in winter
References
[ 1 ] 刘谊,郑高升,闫红新,等.刘庄煤矿特大型主井井塔人工冻融土地基基础综合研究报告[R].合肥,2006.