Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2012, Volume 14, Issue 5

Research of steel box girder dehumidification in Taizhou Bridge

1. Jiangsu Provincial Yangtze River Highway Bridge Construction Commanding Department, Taizhou, Jiangsu 225321, China;

2. Yangzhou Polytechnic College, Yangzhou, Jiangsu 225009, China

Received: 2012-03-12 Available online: 2012-05-14 16:20:22.000

Next Previous

Abstract

The steel box girder of Taizhou Bridge is 2 160 m long with volume of about 240 thousand m3. The paper analyzes the principle, lectotype, setting, workflow and construction of the steel box girder dehumidification. And the paper protocols the quality inspection and evaluation standards of the steel box girder dehumidification in Taizhou Bridge. It proposes reference for similar project.

Figures

图1

图2

图3

图4

图5

References

[ 1 ] 邹宏华,周琦.桃夭门大桥钢箱梁除湿系统[J].公路与汽运,2010(6):144-147. link1

[ 2 ] 泰州长江公路大桥专项质量检验评定标准[Z].2011

[ 3 ] 叶觉明.钢箱梁抽湿机除湿系统应用[J].腐蚀与防护,2002,22(10):441-444. link1

Related Research