Approximate calculation method of main cables PPWS construction traction force for extralarge span suspension bridgeWang

1. Jiangsu Provincial Yangtze River Highway Bridge Construction Commanding Department, Taizhou, Jiangsu 225321, China;

2. CCC-SHB Second Engineering Co. Ltd., Xi'an 710119, China

Funding project:交通行业联合科技攻关项目(2008-353-332-170); 江苏省“333高层次人才培养工程”专项资助 Received: 2012-03-15 Available online: 2012-05-14 16:20:22.000

Next Previous

Abstract

For the large number of wire strands and the long distance of strand traction, the wire strands are erected normally with gantry pulling traction system that allows continuous pylon passing in the construction of main cables with PPWS(prefabricated parrel wire strand) method for an extra-large span suspension bridge. The accurate calculation of traction force is of realistic significance to the selection of traction equipment and ensuring smooth construction. In early days of suspension bridge construction, the capacity demand and type of traction equipment were determined mainly based on experience. In this article, exploration was made for the traction force calculation method of the gantry pulling traction system for PPWS construction, and the results were compared with measured data on work site. It proves that the calculation result is reliable and can be used in construction calculation.

Figures

图1

图2

图3

图4

图5

图6

References

[ 1 ] 王峻,杨宁,吉林.江阴大桥主缆施工[C]//中国公路学会桥梁和结构工程学会一九九九年桥梁学术讨论会论文集.1999.

[ 2 ] 薛光雄,金仓,杜洪池,等.润扬大桥悬索桥牵引系统设计与施工[J].桥梁建设,2004(4):25-28. link1

[ 3 ] 杨进.泰州长江公路大桥主桥三塔悬索桥方案设计的技术理念[J].桥梁建设,2007(3):33-35. link1

Related Research