Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2012, Volume 14, Issue 5

The error adjusting method of lineshape control for the middle steel tower of Taizhou Bridge

1. Jiangsu Provicial Yangtze River Highway Bridge Construction Commanding Department, Taizhou, Jiangsu 225321, China;

2. CCCC Second Harbour Engineering Company Ltd., Wuhan 430040, China;

3. Key Lab of Large-span Bridge Construction Technology, Ministry of Communication, Wuhan 430040, China

Funding project:国家科技支撑计划资助项目(2009BAG15B02); 交通行业联合科技攻关项目(2008-353-332-180) Received: 2012-03-16 Available online: 2012-05-14 16:20:22.000

Next Previous

Abstract

The middle tower of Taizhou Bridge is a steel frame with longitudinal herringbone shape and lateral gate shape, which is used for the first time. The technology with segments fabricated in the factory and erection at site is used in the construction of the middle steel tower. A full-procedure construction control system to the complicated tower is set up. Based on precise monitoring and control to the shape of the segments and the line-shape of the tower at the fabrication stage, the adjustment of the adjusting gap of the tower is calculated according to the actual error of the tower at the erection stage, and the line-shape error of the tower is adjusted. The result of the implementation of the middle steel tower of Taizhou Bridge indicated that the line-shape control method adapted could be effective, and the precision of final line-shape of the middle steel tower is better than that of the design requirements.

Figures

图1

图2

图3

图4

References

[ 1 ] 刘建波,张永涛,游新鹏,等.泰州大桥中塔安装施工关键技术[J].中国港湾建设,2011,4:56-59. link1

[ 2 ] 李宗平,唐启,张六一.南京长江第三大桥钢塔柱安装施工[J].施工技术,2008,37(5):105-110. link1

[ 3 ] 章登精.南京长江第三大桥钢塔工程控制技术[J].中国铁道科学,2007,28(4):133-140. link1