Strategic Study of CAE >> 2013, Volume 15, Issue 6
Study of implement scheme for using Yangtze estuary waterways dredged soil to Hengsha east shoal reclamation
Shanghai Waterway Engineering Design and Consulting Co., Ltd., Shanghai 200120, China
Next Previous
Abstract
According to the Yangtze estuary waterway construction and planning conditions, combined with the Hengsha new ports plan idea, the paper proposes the implement scheme for using Yangtze estuary waterway dredged soil to Hengsha east shoal reclamation, and analyzes technical feasibility and economic reasonableness, and put forward useful suggestions for using dredged soil for reclamation. The study of implement scheme can give technical reference for the design and construction of similar reclamation projects in Hengsha east shoal or the Yangtze estuary region.
References
[ 1 ] 交通运输部长江口航道管理局. 长江口航道发展规划[R]. 上 海:长江口航道管理局,2010.
[ 2 ] 季 岚,唐 臣,张建峰,等. 长江口疏浚土在横沙东滩吹填工 程中的应用[J]. 水运工程,2011,36(7):163-167. link1
[ 3 ] 季 岚,唐 臣. 长江口深水航道配套吹泥站吹泥管线建造方 案[R]. 上海:中交上海航道勘察设计研究院有限公司,2012.