Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2013, Volume 15, Issue 8

The curve adjustment method of girder segments without hangers for suspension bridge with three-span continuous stiffening girder

1. Nanjing Major Road & Bridge Construction Commanding Department, Nanjing 210033, China;

2. School of Civil Engineering, Southwest Jiaotong University, Chengdu 600031, China;

3. CCCC Highway Consultants Co., Ltd., Beijing 100088, China

Received: 2013-05-22 Available online: 2013-08-28 08:26:08.000

Next Previous

Abstract

It is a difficult technical problem to make sure that the curve of girder segments without han-gers is transitioned smoothly and the system transformation is successful and that the internal force keeps consistent with the girder curve when connecting the segments near the tower rigidly and transferring structure system for the suspension bridge with three-span continuous stiffening girder. The system transformation methods at home and abroad of girder segments without hangers are discussed in this paper, and by taking a suspension bridge of over 1 000 m with three-span continuous stiffening girder as an example, the system transformation, curve adjustment and construction control of the girder segments without hangers are realized.

Figures

图1

图2

References

[ 1 ] Niels J Gimsing.大贝耳特海峡:东桥[M]. 西南交通大学,中铁 大桥局集团武汉桥梁科学研究院,译. 成都:西南交通大学出 版社,2008.

[ 2 ] 唐茂林,许宏亮,沈锐利,等.西堠门大桥无索区梁段线形调整 与控制[J]. 公路,2009(1):43-47. link1

[ 3 ] 潘世建,杨盛福. 科研·试验·专用技术标准[M]. 北京:人民交通 出版社,2002.

[ 4 ] 唐茂林. 大跨度悬索桥空间几何非线性分析与软件开发[D]. 成 都:西南交通大学,2003. link1

Related Research