High precision installation technology of metal structure embedded parts of Three Gorges Project ship lift

Gezhouba Group Mechanical & Electrical Construction Co., Ltd., Chengdu 610091, China

Received: 2013-06-28 Available online: 2013-09-10 13:12:13.000

Next Previous

Abstract

Based on the layout characteristics of the first-stage and second-stage metal structure embedded parts, and combined with the site construction environment, this article analyzes the high precision installation method in detail. At the same time, various construction plans which are suitable for Three Gorges Project ship lift are put forward. These construction plans which have been successfully used in Three Gorges Project have solved many technological problems, such as the deformation control of the embedded parts, fast and accurate positioning, high precision measurement and so on. Meanwhile, these technologies provide a reference for the constructions of similiar projects.

Figures

图1

图2

References

[ 1 ] 梁仁强,李 峰. 三峡升船机施工技术研究与实践[J]. 人民长 江,2011,42(16):51-55. link1

[ 2 ] 杨 红,李俊波. 三峡升船机船厢室段关键金属结构安装技术 研究与实践[J]. 中国水运,2012,12(11):221-223. link1

[ 3 ] 张俊松. 三峡升船机齿条、螺母柱一期埋件安装[J]. 价值工程, 2011(31):41-42. link1

[ 4 ] 王宗禄,李俊波,杨 红,等. 三峡升船机齿条及螺母柱安装 方案研究与实施[J]. 中华民居,2012(10):218-219. link1

Related Research