Abstract

Key technologies of precision blasting were put forward based on characteristics of urban viaduct blasting demolition in complicated surroundings. Initial bending instability mechanics model of reinforcing steel bar frame of blasting fragmented pier and sequenced collapsed dynamics model were established for quantitative blasting design. Technologies of water pressure blasting were applied in multi-cell box girder fragmentation. The initiation network of non-electric duplication crossover was adopted for safety and reliability of ultra-long delay. The rationality of blasting scheme and parameters were validated by physical model test. Adverse effects were forecasted and controlled by integrated protective technologies. Specialization cooperation,precision,execution(SCPE)project management method was put forward for precision management. Key technologies of precision demolition blasting can provide reference for similar projects.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

图10

图11

图12

图13

图14

References

[ 1 ] 谢先启. 精细爆[M]. 武汉:华中科技大学出版社,2010.

[ 2 ] 卢文波. 除爆破中裸露钢筋骨架的失稳模型 [J].爆破,1992,9 (2):31-34. link1

[ 3 ] 关志中. 用控制爆破拆除2l米高钢筋混凝土框架大楼[C]//爆破 与安全. 武汉:湖北科技出版社,1984:12-16.

[ 4 ] 冯叔瑜. 城市控制爆破[M]. 北京:中国铁道出版社,1985.

[ 5 ] 李肇胤,袁澍萱. 拆除爆破中钢筋混凝土框架柱的失稳判 据[J]. 爆破,1993,10(2):109-112. link1

[ 6 ] 武汉爆破有限公司.沌阳高架桥爆破拆除工程设计报告[R]. 2013.5.

[ 7 ] 武汉爆破有限公司. 复杂环境下城市超大型高架桥爆破拆除关 键技术鉴定报告[R]. 2013.