检索范围:
排序: 展示方式:
Investigation into viability of using two-stage (pre-placed aggregate) concrete in Irish setting
John O’MALLEY, Hakim S. ABDELGADER,
《结构与土木工程前沿(英文)》 2010年 第4卷 第1期 页码 127-132 doi: 10.1007/s11709-010-0007-4
《结构与土木工程前沿(英文)》 页码 1145-1162 doi: 10.1007/s11709-023-0945-2
关键词: seismic resilience self-centering rubber layer flag-shaped hysteresis loop parametric study
Effect of interface adhesion factor on the bearing capacity of strip footing placed on cohesive soil
《结构与土木工程前沿(英文)》 2021年 第15卷 第6期 页码 1494-1503 doi: 10.1007/s11709-021-0768-y
关键词: bearing capacity soil-rock interface Hoek−Brown yield criterion plasticity limit analysis
Siu-Lai CHAN, Yaopeng LIU, Andy LEE,
《结构与土木工程前沿(英文)》 2010年 第4卷 第3期 页码 376-382 doi: 10.1007/s11709-010-0086-2
关键词: tension system glass wall nonlinear analysis pre-tensioning second-order analysis
A pre-compensation method of the systematic contouring error for repetitive command paths
D. L. ZHANG,Y. H. CHEN,Y. P. CHEN
《机械工程前沿(英文)》 2015年 第10卷 第4期 页码 367-372 doi: 10.1007/s11465-015-0367-5
For a repetitive command path, pre-compensating the contouring error by modifying the command path is practical. To obtain the pre-compensation value with better accuracy, this paper proposes the use of a back propagation neural network to extract the function of systematic contouring errors. Furthermore, by using the extracted function, the contouring error can be easily pre-compensated. The experiment results verify that the proposed compensation method can effectively reduce contouring errors.
关键词: contouring error pre-compensation motion control system back propagation (BP) neural network
《结构与土木工程前沿(英文)》 2023年 第17卷 第3期 页码 411-428 doi: 10.1007/s11709-023-0928-3
关键词: pre-stressed concrete sleeper ultrahigh performance fiber-reinforced concrete pull-out test static bending test steel fiber aspect ratio volume fraction
Weihua Zhao, Meixiang Wang, Jianwei Li, Yu Huang, Baikun Li, Cong Pan, Xiyao Li, Yongzhen Peng
《环境科学与工程前沿(英文)》 2018年 第12卷 第5期 doi: 10.1007/s11783-018-1084-1
A novel two sludge pre-A2NSBR system was developed. Advanced N and P removal was optimized to treat real domestic wastewater. Nitrifiers and PAOs were enriched with 19.41% and 26.48%, respectively. Acetate was demonstrated as the high-quality carbon source type.
关键词: Denitrifying phosphorus removal C/N ratio Nitrate recycling Carbon source type Biological nutrient removal Pre-A2NSBR system
Ali Fadhil NASER, Zonglin WANG
《结构与土木工程前沿(英文)》 2013年 第7卷 第2期 页码 164-177 doi: 10.1007/s11709-013-0196-8
关键词: structural performance steel plates external pre-stressing cracks grouting method static
Techno-economic comparison of three technologies for pre-combustion CO
Simon Roussanaly, Monika Vitvarova, Rahul Anantharaman, David Berstad, Brede Hagen, Jana Jakobsen, Vaclav Novotny, Geir Skaugen
《化学科学与工程前沿(英文)》 2020年 第14卷 第3期 页码 436-452 doi: 10.1007/s11705-019-1870-8
关键词: carbon capture and storage (CCS) techno-economic comparison pre-combustion capture physical solvent low-temperature capture
Mohammed FARUQI, Oved I. MATA, Francisco AGUINIGA
《结构与土木工程前沿(英文)》 2018年 第12卷 第3期 页码 352-360 doi: 10.1007/s11709-017-0453-3
Concrete members historically have used either pre-stressed steel or steel bars. In recent years there has been an increased interest in the use of fiber reinforced polymer (FRP) materials. However, the flexure behavior of a hybrid system reinforced by the combination of pre-stressed steel and glass fiber reinforced (GFRP) is still relatively unknown. The purpose of this work is to study this. Two slabs of 100 and 150-millimeter thickness, with a span of 2.1 m reinforced with both pre-stressing steel and GFRP were constructed and tested to failure using ACI 318-11 and ACI 440.1R-15. The concrete had strength of 31 MPa and the slabs were respectively reinforced with 5#4 bars and 3#5 bars. Each slab had 37.41 mm2 prestressing wire with a failure stress of 1722.5 MPa. The experimental flexural strength and deflection of slabs were compared with their respective sizes theoretical slabs. The theoretical slabs were either reinforced with pre-stressed steel or GFRP rebars, or a hybrid system. It was found that the hybrid system produces better results.
Hailin WANG
《能源前沿(英文)》 2019年 第13卷 第3期 页码 571-578 doi: 10.1007/s11708-019-0640-0
关键词: China’s National Determined Contribution emission reduction potential scenario analysis CO2 emissions peak
Virtual pre-assembly for large steel structures based on BIM, PLP algorithm, and 3D measurement
Ying ZHOU, Wan WANG, Hanbin LUO, Yan ZHANG
《工程管理前沿(英文)》 2019年 第6卷 第2期 页码 207-220 doi: 10.1007/s42524-019-0016-5
关键词: steel structure pre-assembly BIM plane-line-point 3D measurement
Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault
Xiao YAN, Zizheng SUN, Shucai LI, Rentai LIU, Qingsong ZHANG, Yiming ZHANG
《结构与土木工程前沿(英文)》 2019年 第13卷 第6期 页码 1393-1404 doi: 10.1007/s11709-019-0563-1
关键词: pre-grouting stability analysis factor of safety discontinuity layout optimization
WU Xuelei, CHEN Lunqiang, PENG Yongzhen, WANG Pu, WANG Yayi
《环境科学与工程前沿(英文)》 2008年 第2卷 第2期 页码 236-240 doi: 10.1007/s11783-008-0008-x
Xiang LI, Wenzheng ZHANG, Zhong HUANG, Dehao JU, Li HUANG, Mingzhi FENG, Xingcai LU, Zhen HUANG
《能源前沿(英文)》 2019年 第13卷 第3期 页码 483-493 doi: 10.1007/s11708-019-0631-1
关键词: marine engine natural gas methane turbulent jet ignition (TJI) pre-chamber
标题 作者 时间 类型 操作
Investigation into viability of using two-stage (pre-placed aggregate) concrete in Irish setting
John O’MALLEY, Hakim S. ABDELGADER,
期刊论文
Parametric study on seismic performance of self-centering reinforced concrete column with bottom-placed
期刊论文
Effect of interface adhesion factor on the bearing capacity of strip footing placed on cohesive soil
期刊论文
Nonlinear analysis of pre-tensioned glass wall facade by stability function with initial imperfection
Siu-Lai CHAN, Yaopeng LIU, Andy LEE,
期刊论文
A pre-compensation method of the systematic contouring error for repetitive command paths
D. L. ZHANG,Y. H. CHEN,Y. P. CHEN
期刊论文
Experimental and parametrical investigation of pre-stressed ultrahigh-performance fiber-reinforced concrete
期刊论文
Optimization of denitrifying phosphorus removal in a pre-denitrification anaerobic/anoxic/post-aeration+ nitrification sequence batch reactor (pre-A
Weihua Zhao, Meixiang Wang, Jianwei Li, Yu Huang, Baikun Li, Cong Pan, Xiyao Li, Yongzhen Peng
期刊论文
Evaluation of the static and dynamic structural performance of segmental pre-stressed concrete box girder
Ali Fadhil NASER, Zonglin WANG
期刊论文
Techno-economic comparison of three technologies for pre-combustion CO
Simon Roussanaly, Monika Vitvarova, Rahul Anantharaman, David Berstad, Brede Hagen, Jana Jakobsen, Vaclav Novotny, Geir Skaugen
期刊论文
Hybrid flexural components: Testing pre-stressed steel and GFRP bars together as reinforcement for flexural
Mohammed FARUQI, Oved I. MATA, Francisco AGUINIGA
期刊论文
Virtual pre-assembly for large steel structures based on BIM, PLP algorithm, and 3D measurement
Ying ZHOU, Wan WANG, Hanbin LUO, Yan ZHANG
期刊论文
Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault
Xiao YAN, Zizheng SUN, Shucai LI, Rentai LIU, Qingsong ZHANG, Yiming ZHANG
期刊论文
Experimental study of nitrite accumulation in pre-denitrification biological nitrogen removal process
WU Xuelei, CHEN Lunqiang, PENG Yongzhen, WANG Pu, WANG Yayi
期刊论文