资源类型

期刊论文 76

会议视频 1

年份

2023 3

2022 3

2021 5

2020 3

2019 4

2018 5

2017 4

2016 3

2015 2

2014 6

2013 3

2012 2

2011 5

2010 11

2009 6

2008 4

2007 2

2006 1

2005 1

2004 1

展开 ︾

关键词

注浆 3

同步注浆 2

泥水盾构 2

盾构 2

铝合金 2

预处理工艺 2

6016 合金 1

CD44 1

DQP漂白 1

DX桩 1

KP法制浆 1

k-最近邻分类 1

三峡工程 1

不均匀性 1

不良妊娠结局 1

临震前磁异常 1

主成分分析 1

保压 1

信息化施工 1

展开 ︾

检索范围:

排序: 展示方式:

Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault

Xiao YAN, Zizheng SUN, Shucai LI, Rentai LIU, Qingsong ZHANG, Yiming ZHANG

《结构与土木工程前沿(英文)》 2019年 第13卷 第6期   页码 1393-1404 doi: 10.1007/s11709-019-0563-1

摘要: Pre-grouting is a popular ground treatment strategy utilized to enhance the strength and stability of strata during the excavation of a tunnel through a fault zone. Two important questions need to be answered during such an excavation. First, how should the grouting size be determined? Second, when should excavation begin after grouting? These two questions are conventionally addressed through empirical experience and standard criteria because a reliable quantitative approach, which would be preferable, has not yet been developed. To address these questions, we apply a recently proposed numerical approach known as discontinuity layout optimization, an efficient node-based upper bound limit analysis method. A case study is provided utilizing a tunnel located in a stratum characterized by complicated geological conditions, including soft soil and a fault zone. The factor of safety is used to quantitatively assess the stability of the tunnel section. The influences of the grouted zone thickness and the time-dependent material properties of the grouted zone on the stability of the tunnel section are evaluated, thereby assisting designers by quantitatively assessing the effects of pre-grouting.

关键词: pre-grouting     stability analysis     factor of safety     discontinuity layout optimization    

Evaluation of the static and dynamic structural performance of segmental pre-stressed concrete box girder

Ali Fadhil NASER, Zonglin WANG

《结构与土木工程前沿(英文)》 2013年 第7卷 第2期   页码 164-177 doi: 10.1007/s11709-013-0196-8

摘要: The objectives of this study are to explain the repairing and strengthening methods which are used to improve the structural performance of the bridge structure, to analyze the static and dynamic responses after strengthening, and to evaluate the performance of the bridge structure after repairing and strengthening. The methods of repairing and strengthening include reconstruction the deck of the bridge by casting 10 cm layer of concrete, strengthening the web and bottom floor of box girders of middle spans and side spans by sticking the steel plates, strengthening the whole bridge structure by using external pre-stressing tendons, and treatment the cracks. The results of theoretical analysis show that the values of tensile stress and vertical deflection are decreased and the compressive stress is increased after strengthening. There are not tensile stresses are appeared in the sections of the bridge structure. The modal analysis results show that the value of natural frequency is equal to 2.09 Hz which is more than the values before strengthening which is equal to 1.64 Hz, indicating that the stiffness of the bridge structure is improved and the strengthening process is effective to improve the cracks resistance and bearing capacity of the bridge structure.

关键词: structural performance     steel plates     external pre-stressing     cracks     grouting method     static    

隐覆型岩溶地基稳定性分析与压浆预处理

孙成访,杨安蓉,董汉雄,彭少民

《中国工程科学》 2002年 第4卷 第7期   页码 56-59

摘要:

通过对隐覆型岩溶地基稳定性的分析,采用压浆法预处理隐覆型岩溶地基,并对压浆效果进行了分析评价,研究结果表明, 压浆预处理隐覆型岩溶地基在技术上和经济上是可行的。

关键词: 岩溶地基     压力压浆     效果评价    

海底隧道断层破碎带信息化施工

杨会军,王梦恕,卓越,罗嵩

《中国工程科学》 2012年 第14卷 第10期   页码 57-64

摘要:

海底隧道开挖支护施工难度很大、安全风险极高,结合国内第二条海底隧道断层破碎带施工。采用地质调查、隧道地震勘探法(TSP法)、隧道内超前钻孔等方法,通过数据分析处理,预测了掌子面前方45 m范围内的基本地质条件,如岩性、规模、位置的长期超前地质预报,以及精度较高的短期超前地质预报,据此综合超前地质预报结果,采取上半断面全断面超前预注浆加固地层、台阶法开挖、加强支护。同时,对施工中水平收敛、拱顶下沉等监控量测数据进行分析,动态反馈于施工过程中,此即海底隧道断层破碎带信息化施工。该方法在施工中取得令人满意的结果。

关键词: 海底隧道断层破碎带     综合超前地质预报     超前预注浆     信息化施工    

Experimental study on pile-end post-grouting piles for super-large bridge pile foundations

Weiming GONG, Guoliang DAI, Haowen ZHANG

《结构与土木工程前沿(英文)》 2009年 第3卷 第2期   页码 228-233 doi: 10.1007/s11709-009-0019-0

摘要: The application of pile-end post-grouting piles for super-large bridge pile foundations in some important projects was introduced in this paper. There are totally 21 test piles. The maximum pile diameter varies from 2.5 m to 3 m, and the maximum length is 125 m; the bearing capacity of the post-grouting piles is over ten thousands tons. Based on the test results, the bearing capacity, displacement, and bearing characteristic before and after grouting were analyzed. The results show that the bearing capacity of the piles are increased in different degrees after grouting although the technical parameters, including the patterns of grouting pipes, pressure, dosages of cement, duration of grouting lasting time, are different. However, the obtained values are very discrete. In addition, the calculation formula for the post-grouting piles under specified grouting condition was deduced based on the statistics analysis results of 57 test piles. The research results have been applied in the design of bridge foundation.

关键词: self-balanced testing technique     pile-end post-grouting     bearing capacity     grouting technology    

Seismic performance of fabricated continuous girder bridge with grouting sleeve-prestressed tendon composite

《结构与土木工程前沿(英文)》   页码 827-854 doi: 10.1007/s11709-023-0954-1

摘要: The seismic performance of a fully fabricated bridge is a key factor limiting its application. In this study, a fiber element model of a fabricated concrete pier with grouting sleeve-prestressed tendon composite connections was built and verified. A numerical analysis of three types of continuous girder bridges was conducted with different piers: a cast-in-place reinforced concrete pier, a grouting sleeve-fabricated pier, and a grouting sleeve-prestressed tendon composite fabricated pier. Furthermore, the seismic performance of the composite fabricated pier was investigated. The results show that the OpenSees fiber element model can successfully simulate the hysteresis behavior and failure mode of the grouted sleeve-fabricated pier. Under traditional non-near-fault ground motions, the pier top displacements of the grouting sleeve-fabricated pier and the composite fabricated pier were less than those of the cast-in-place reinforced concrete pier. The composite fabricated pier had a good self-centering capability. In addition, the plastic hinge zones of the grouting sleeve-fabricated pier and the composite fabricated pier shifted to the joint seam and upper edge of the grouting sleeve, respectively. The composite fabricated pier with optimal design parameters has good seismic performance and can be applied in high-intensity seismic areas; however, the influence of pile-soil interaction on its seismic performance should not be ignored.

关键词: seismic performance     continuous girder bridge     grouting sleeve-prestressed tendon composite connections     grouted sleeve connection     design parameters    

高压富水断层“外堵内固注浆法”设计新理念与工程实践

张民庆,张梅

《中国工程科学》 2009年 第11卷 第12期   页码 26-34

摘要:

宜万铁路齐岳山隧道F11断层由断层角砾岩、破裂岩、断层泥组成,断层内富含高压水,超前探孔单孔最大涌水量1 800 m3/h,水压力2.5 MPa。针对F11高压富水断层,前期按“以堵为主、限量排放”施工原则,采取全断面帷幕注浆措施,注浆工程量大、进度慢。为及早攻克F11高压富水断层,建设单位多次邀请院士、专家现场踏勘、研讨,提出“注浆加固、分水降压、快挖快封、加强监测、综合治理”施工技术方案,将全断面帷幕注浆调整为外堵内固注浆。对于高压富水断层,通常的设计是加固圈厚一些、加固体强一些,而外堵内固注浆是将隧道周边岩体、水量及水压力分布假定为不均匀性,从而通过超前探孔锁定弱水区和强水区,针对弱水区采取基本注浆,对强水区采取加强注浆,注浆机理为“封堵裂隙、减少水量;固结围岩、改良地层。”注浆时,先通过区域定位孔进行无约束注浆堵水,从而使地层中水量得到有效控制,然后按“合理步距、封堵水流,由外到内、环环相扣,间隔跳孔、锁定水源,增加补孔、区域加强”的注浆理念进行注浆施工。通过现场实践,外堵内固注浆能达到注浆堵水和加固效果。外堵内固注浆与全断面帷幕注浆相比,注浆孔数量和注浆量减少50 %,在水量大时,注浆进度提高80 %,一般情况下提高50 %以上,因此,外堵内固注浆具有广阔的推广应用价值。

关键词: 高压富水断层     不均匀性     注浆堵水加固     外堵内固注浆     创新    

厦门翔安海底隧道F1风化深槽注浆加固技术

郭小红,王梦恕

《中国工程科学》 2011年 第13卷 第9期   页码 38-41

摘要:

以厦门翔安海底隧道涌水量最大、施工难度最大的海域段F1风化槽为研究对象,根据其围岩地质条件和突涌水特点,采用全断面注浆加固和堵水,注浆加固范围为掌子面内及隧道开挖轮廓线外5 m,隧道纵向加固长度为70 m,注浆材料以超细水泥单液浆为主的注浆加固方案。施工期现场监控量测与数值计算结果表明:F1风化深槽围岩注浆加固效果均较为理想,未发生涌水突泥,达到了设计的技术要求。该项研究成果为今后开展类似工程的注浆加固提供了技术借鉴。

关键词: 海底隧道     注浆加固     稳定性     数值仿真    

三峡升船机齿条及螺母柱间隙灌浆工艺试验

詹剑霞,李纪虎

《中国工程科学》 2013年 第15卷 第9期   页码 45-49

摘要:

为了选择出合适的灌浆材料和灌浆工艺并模拟升船机齿条、螺母柱间隙灌浆的实际情况,分别进行了灌浆工艺试验与原型灌浆试验。灌浆工艺试验对比了3种国产灌浆材料和德国PAGEL灌浆材料,试验结果表明德国PAGEL灌浆材料物理性能指标和力学性能指标优于国产灌浆材料。在原型灌浆试验中,对灌浆设备选型、搅拌时间、模板密封、灌浆方式、灌浆流速参数控制等方面进行了试验研究,优选出适用于三峡升船机齿条、螺母柱接缝灌浆的材料和合适的灌浆工艺。以上试验效果明显,解决了灌浆密封难度大、易堵管等施工难题。

关键词: 齿条     螺母柱     灌浆     升船机     三峡工程    

Nonlinear analysis of pre-tensioned glass wall facade by stability function with initial imperfection

Siu-Lai CHAN, Yaopeng LIU, Andy LEE,

《结构与土木工程前沿(英文)》 2010年 第4卷 第3期   页码 376-382 doi: 10.1007/s11709-010-0086-2

摘要: Pre-tensioned high strength trusses using alloy steel bar are widely used as glass wall supporting systems because of the high degree of transparency. The breakage of glass panes in this type of system occurs occasionally, likely to be due to error in design and analysis in addition to other factors like glass impurity and stress concentration around opening in a spider system. Most design does not consider the flexibility of supports from finite stiffness of supporting steel or reinforced concrete beams. The resistance of lateral wind pressure of the system makes use of high tension force coupled with the large deflection effect, both of which are affected by many parameters not generally considered in conventional structures. In the design, one must therefore give a careful consideration on various effects, such as support settlement due to live loads and material creep, temperature change, pre-tension force, and wind pressure. It is not uncommon to see many similar glass wall systems fail in the wind load test chambers under a design wind speed. This paper presents a rigorous analysis and design of this type of structural systems used in a project in Hong Kong, China. The stability function with initial curvature is used in place of the cubic function, which is only accurate for linear analysis. The considerations and analysis techniques are believed to be of value to engineers involved in the design of the structural systems behaving nonlinearly.

关键词: tension system     glass wall     nonlinear analysis     pre-tensioning     second-order analysis    

A pre-compensation method of the systematic contouring error for repetitive command paths

D. L. ZHANG,Y. H. CHEN,Y. P. CHEN

《机械工程前沿(英文)》 2015年 第10卷 第4期   页码 367-372 doi: 10.1007/s11465-015-0367-5

摘要:

For a repetitive command path, pre-compensating the contouring error by modifying the command path is practical. To obtain the pre-compensation value with better accuracy, this paper proposes the use of a back propagation neural network to extract the function of systematic contouring errors. Furthermore, by using the extracted function, the contouring error can be easily pre-compensated. The experiment results verify that the proposed compensation method can effectively reduce contouring errors.

关键词: contouring error     pre-compensation     motion control system     back propagation (BP) neural network    

Experimental and parametrical investigation of pre-stressed ultrahigh-performance fiber-reinforced concrete

《结构与土木工程前沿(英文)》 2023年 第17卷 第3期   页码 411-428 doi: 10.1007/s11709-023-0928-3

摘要: In this study, ultrahigh-performance fiber-reinforced concrete (UHPFRC) used in a type B70 concrete sleeper is investigated experimentally and parametrically. The main parameters investigated are the steel fiber volume fractions (0%, 0.5%, 1%, and 1.5%). Under European standards, 35 UHPFRC sleepers are subjected to static bending tests at the center and rail seat sections, and the screw on the fastening system is pulled out. The first cracking load, failure load, failure mode, crack propagation, load–deflection curve, load–crack width, and failure load from these tests are measured and compared with those of a control sleeper manufactured using normal concrete C50. The accuracy of the parametric study is verified experimentally. Subsequently, the results of the study are applied to UHPFRC sleepers with different concrete volumes to investigate the effects of the properties of UHPFRC on their performance. Experimental and parametric study results show that the behavior of UHPFRC sleepers improves significantly when the amount of steel fiber in the mix is increased. Sleepers manufactured using UHPFRC with a steel fiber volume fraction of 1% and a concrete volume less than 25% that of standard sleeper B70 can be used under the same loads and requirements, which contributes positively to the cost and surrounding environment.

关键词: pre-stressed concrete sleeper     ultrahigh performance fiber-reinforced concrete     pull-out test     static bending test     steel fiber     aspect ratio     volume fraction    

Investigation into viability of using two-stage (pre-placed aggregate) concrete in Irish setting

John O’MALLEY, Hakim S. ABDELGADER,

《结构与土木工程前沿(英文)》 2010年 第4卷 第1期   页码 127-132 doi: 10.1007/s11709-010-0007-4

摘要: Two-stage (pre-placed aggregate) concrete (TSC) consists of coarse aggregate, which is first deposited into the formwork, and grout, which is later pumped into the formwork from the bottom up to bind the stone together into a monolith. During the course of this study the formation of grout for two stage concrete was investigated using readily available 5 mm sand mixed in a slow speed paddle mixer.  Silica fume and a superplasticizer were used in the mix to see if the necessary stability and fluidity could be achieved without the use of a specialized plant, essentially to see if TSC could be produced on a small scale using native Irish aggregates. A much higher degree of sedimentation was recorded during testing than was expected. As a result, the use of 5 mm sand and a slow speed mixer in combination were found to be not conducive to the successful production of TSC grout, without further research and testing.

关键词: grout     pre-placed     concrete     two-stage concrete (TSC)    

Optimization of denitrifying phosphorus removal in a pre-denitrification anaerobic/anoxic/post-aeration+ nitrification sequence batch reactor (pre-A

Weihua Zhao, Meixiang Wang, Jianwei Li, Yu Huang, Baikun Li, Cong Pan, Xiyao Li, Yongzhen Peng

《环境科学与工程前沿(英文)》 2018年 第12卷 第5期 doi: 10.1007/s11783-018-1084-1

摘要:

A novel two sludge pre-A2NSBR system was developed.

Advanced N and P removal was optimized to treat real domestic wastewater.

Nitrifiers and PAOs were enriched with 19.41% and 26.48%, respectively.

Acetate was demonstrated as the high-quality carbon source type.

关键词: Denitrifying phosphorus removal     C/N ratio     Nitrate recycling     Carbon source type     Biological nutrient removal     Pre-A2NSBR system    

Techno-economic comparison of three technologies for pre-combustion CO

Simon Roussanaly, Monika Vitvarova, Rahul Anantharaman, David Berstad, Brede Hagen, Jana Jakobsen, Vaclav Novotny, Geir Skaugen

《化学科学与工程前沿(英文)》 2020年 第14卷 第3期   页码 436-452 doi: 10.1007/s11705-019-1870-8

摘要: This paper compares the techno-economic performances of three technologies for CO capture from a lignite-based IGCC power plant located in the Czech Republic: (1) Physical absorption with a Rectisol-based process; (2) Polymeric CO -selective membrane-based capture; (3) Low-temperature capture. The evaluations show that the IGCC plant with CO capture leads to costs of electricity between 91 and 120 €·MWh , depending on the capture technology employed, compared to 65 €·MWh for the power plant without capture. This results in CO avoidance costs ranging from 42 to 84 €· , mainly linked to the losses in net power output. From both energy and cost points of view, the low-temperature and Rectisol based CO capture processes are the most efficient capture technologies. Furthermore, partial CO capture appears as a good mean to ensure early implementation due to the limited increase in CO avoidance cost when considering partial capture. To go beyond the two specific CO -selective membranes considered, a cost/membrane property map for CO -selective membranes was developed. This map emphasise the need to develop high performance membrane to compete with solvent technology. Finally, the cost of the whole CCS chain was estimated at 54 €· once pipeline transport and storage are taken into consideration.

关键词: carbon capture and storage (CCS)     techno-economic comparison     pre-combustion capture     physical solvent     low-temperature capture    

标题 作者 时间 类型 操作

Quantitatively assessing the pre-grouting effect on the stability of tunnels excavated in fault

Xiao YAN, Zizheng SUN, Shucai LI, Rentai LIU, Qingsong ZHANG, Yiming ZHANG

期刊论文

Evaluation of the static and dynamic structural performance of segmental pre-stressed concrete box girder

Ali Fadhil NASER, Zonglin WANG

期刊论文

隐覆型岩溶地基稳定性分析与压浆预处理

孙成访,杨安蓉,董汉雄,彭少民

期刊论文

海底隧道断层破碎带信息化施工

杨会军,王梦恕,卓越,罗嵩

期刊论文

Experimental study on pile-end post-grouting piles for super-large bridge pile foundations

Weiming GONG, Guoliang DAI, Haowen ZHANG

期刊论文

Seismic performance of fabricated continuous girder bridge with grouting sleeve-prestressed tendon composite

期刊论文

高压富水断层“外堵内固注浆法”设计新理念与工程实践

张民庆,张梅

期刊论文

厦门翔安海底隧道F1风化深槽注浆加固技术

郭小红,王梦恕

期刊论文

三峡升船机齿条及螺母柱间隙灌浆工艺试验

詹剑霞,李纪虎

期刊论文

Nonlinear analysis of pre-tensioned glass wall facade by stability function with initial imperfection

Siu-Lai CHAN, Yaopeng LIU, Andy LEE,

期刊论文

A pre-compensation method of the systematic contouring error for repetitive command paths

D. L. ZHANG,Y. H. CHEN,Y. P. CHEN

期刊论文

Experimental and parametrical investigation of pre-stressed ultrahigh-performance fiber-reinforced concrete

期刊论文

Investigation into viability of using two-stage (pre-placed aggregate) concrete in Irish setting

John O’MALLEY, Hakim S. ABDELGADER,

期刊论文

Optimization of denitrifying phosphorus removal in a pre-denitrification anaerobic/anoxic/post-aeration+ nitrification sequence batch reactor (pre-A

Weihua Zhao, Meixiang Wang, Jianwei Li, Yu Huang, Baikun Li, Cong Pan, Xiyao Li, Yongzhen Peng

期刊论文

Techno-economic comparison of three technologies for pre-combustion CO

Simon Roussanaly, Monika Vitvarova, Rahul Anantharaman, David Berstad, Brede Hagen, Jana Jakobsen, Vaclav Novotny, Geir Skaugen

期刊论文