Assistant pullback technology for main span closure of Sutong Bridge

1. CCCC-Second Habour Engineering Company Limited, Wuhan 430014, China;

2. Key Lab of Large-span Bridge Construction Technology, Ministry of Communications, PRC, Wuhan 430071, China

Funding project:国家科技支撑计划资助项目(2006BAG04B03) Received: 2008-11-21

Next Previous

Abstract

By abstracting the advantage of the pullback method abroad and the deomestric temperature-cutting method, a new assistant pullback method is put forward and brought into practice actually. In this paper, the analysis key point of practice conditions, key parameter of practice, main measures of the method and the performance are introduced.

Figures

图1

图2

References

[ 1 ] 李勇.湛江海湾大桥钢箱梁安装施工[J].广东公路交通,2006,32(2):33-36 link1

[ 2 ] 沈斌,谢发祥.南京长江第三大桥钢箱梁桥面吊机及梁段吊装工程[J].世界桥梁,2006,34(3):19-22 link1

[ 3 ] 张军.安庆长江公路大桥钢箱梁安装技术[J].中国公路建设市场,2006,30(1):24-27

[ 4 ] 毛志坚.峃石大桥钢箱梁施工[J].公路,1998,22(3):8-12 link1

Related Research