Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2010, Volume 12, Issue 1

Large engineering project in China based on questionnaire investigation

School of Civil and Architectural Engineering, Central South University, Changsha 410075 , China

Funding project:中国工程院咨询项目"我国工程管理现状及发展关键问题研究"资助(2006-X-12) Received: 2008-04-11 Available online: 2010-01-14 11:18:01.000

Next Previous

Abstract

,The design idea and main contents of the questionnaire, which is about the decision-making stage of large engineering project in China, were introduced in the paper. The descriptive statistics analysis, frequency analysis, correlation analysis and crosstab analysis were used in data analysis. Statistic data indicated that the restraint and incentive mechanisms to the decision maker need further improvement. The working depth of previous research basically satisfied decision-making requirement. But the decision-making work was unsatisfactory. The correlation analysis suggested that the attitude of the decision maker is the decisive factor of the quality of previous research. In view of most of the people interviewed, unfeasibility study is necessary for the large engineering project in China.

Figures

图1

图2

图3

图4

图5

图6

References

[ 1 ] 罗依平.政府决策机制优化研究—基于1978年以来我国改革开放的视域[D].苏州:苏州大学,2006.37-51

[ 2 ] 陈伟.重大工程项目决策机制研究[D].武汉:武汉理工大学,2005.1-5 link1

[ 3 ] 张金锁.工程项目管理学[M].北京:科学出版社,2000.8-12

[ 4 ] 姚国兵.政府投资项目决策机制研究—以建德市为例[D].杭州:浙江大学,2006.18-21

Related Research