Abstract

Taizhou Changjiang River Highway Bridge adopts a three-tower, two-span layout for the first time in the world. The longitudinal shape of the middle tower is herringbone, and the steel gallows frame is adopted in the cross direction. This paper describes the installation, locating, and adjusting construction techniques of the huge segments including the selection of hoisting equipment.