Strategic Study of CAE >> 2010, Volume 12, Issue 4
The hoisting techniques of huge segments of the steel tower
China Communications 2nd Navigational Bureau 2nd Engineering Co., Ltd., Chongqing 400042, China
Next Previous
Abstract
Taizhou Changjiang River Highway Bridge adopts a three-tower, two-span layout for the first time in the world. The longitudinal shape of the middle tower is herringbone, and the steel gallows frame is adopted in the cross direction. This paper describes the installation, locating, and adjusting construction techniques of the huge segments including the selection of hoisting equipment.
Keywords
huge segments of steel tower ; lifting ; positioning ; adjusting ; precision control ; positioning system
References
[ 1 ] 李宗平,唐启,张六一.南京长江第三大桥钢塔柱安装施工[J].施工技术,2008,5(5):105-110 link1