Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2010, Volume 12, Issue 4

Latest research progress of main cable dehumidification system of suspension bridge in China

Jiangsu Province Yangtze Highway Bridge Construction Commanding Department, Taizhou, Jiangsu 225321, China

Funding project:部省联合攻关项目(2008-353-332-170) Received: 2010-01-29 Available online: 2010-04-14 13:19:22.000

Next Previous

Abstract

This paper describes the latest progress of main cable dehumidification system key technology, including the dry air dehumidification system design parameters research, the main cable over-pressure exhaust system research, dehumidifiers energy-saving research, and S-type wire localization research, etc.

Figures

图1

图2

图4

图4

图5

图6

图7

References

[ 1 ] 付春晓,雷俊卿.既有悬索桥主缆现状的检测与研究[J].世界桥梁,2002,(4):70-74 link1

[ 2 ] 王永强,胡定成.悬索桥主缆的腐蚀机理及其防护措施[J].国外桥梁,2001,(3):41-45 link1

[ 3 ] Makoto Kitagawa, Shuichi Suzuki, Motoi Okuda.Assessment of cable maintenance technologies for Honshu - Shikoku bridges [ J] .Journal of bridge engineering, 2001 ,11 /12 : 418 -424 link1

[ 4 ] 江苏省长江公路大桥建设指挥部,解放军理工大学,江苏省交通规划设计院有限公司.悬索桥主缆防护技术研究报告[R].2009

[ 5 ] 江苏省长江公路大桥建设指挥部,江苏省交通规划设计院有限公司,解放军理工大学.泰州长江公路大桥主缆除湿系统自主研发关键技术研究报告[R].2009

[ 6 ] 江苏法尔胜新日制铁缆索有限公司,江苏省长江公路大桥建设指挥部.悬索桥主缆用S型钢丝国产化关键技术研究报告[R].2009

Related Research