Abstract

Relying on the construction under crossing the existed south Tongpu Railway with a small included angle at Gaoqiao tunnel of Zhengzhou-Xi’an high speed rail, carrying out the test and study, the mechanical characteristics and key construction techniques of the double-layer support system of large-section loess tunnels by benching method are acquired. It successfully resolved the construction difficulties of super-large-section tunnel (171m2) under crossing the operating railway in the depth of only 11m under sandy neoloess, thus to have the significant reference for the design and construction of the similar engineering.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

图10

图11

图12

图13

图14

图15

图16

图17

图18

图19

References

[ 1 ] 王晓州,丁维利,王庆林,等. 浅埋大断面黄土隧道下穿既有铁 路施工技术[J]. 铁道标准设计,2007(S1):67-71. link1

[ 2 ] 中铁第一勘察设计院集团有限公司,中铁西南科学研究院有限 公司,西南交通大学,等. 郑西客专大断面黄土隧道施工方法与 监控技术研究报告[R]. 西安:中铁第一勘察设计院集团有限公 司,2008.

[ 3 ] 中铁西南科学研究院有限公司. 郑西客运专线大断面黄土隧道 施工方法与监控技术研究——力学特性现场测试报告(西南研 字第580号)[R]. 成都:中铁西南科学研究院有限公司,2008.

[ 4 ] 李国良,宋 冶,李 雷,等. 郑西高铁大断面黄土隧道施工方 法研究[C]// 第七届世界高速铁路大会论文集(上册). 北京:中 国铁道出版社,2010:43-50.

[ 5 ] 宋 冶,王新东,王 刚,等. 客运专线大断面黄土隧道施工监 控技术[J]. 铁道工程学报,2010(1):52-58. link1

Related Research