Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2014, Volume 16, Issue 6

Design scheme and implementation for HY-2 ground segment mission control

1. Ocean University of China,Qingdao,Shandong 266100,China;

2. National Satellite Ocean Application Service,Beijing 100081,China

Funding project:海洋公益性行业科研专项经费项目(201105032) Received: 2014-04-10 Available online: 2014-07-09 13:26:37.000

Next Previous

Abstract

Design scheme and implementation for HY-2 ground segment is introduced in this paper. Mission control subsystem is responsible for task scheduling,and system monitor,is nerve center of ground segment. Mixture of C/S and B/S architecture is used for operational and control system (OCS) by its characteristic.Mission control subsystem of HY-2 has three types of scheduling task:real time scheduling task,fixed time scheduling task,data reprocessing scheduling task. In order to reduce scheduling complexity,layered scheduling model is used because of complexity of data processing procedure. Automatic operation pattern is used,making plans in advance,distributed task scheduling,centralized operational system status monitor.

Figures

图1

图2

图3

图4

图5

图6

图7

References

[ 1 ] 李小龙,毛文林.管道-过滤器模式的软件体系结构及其设计[J]. 计算机工程与应用,2003,39(35):114-115. link1

[ 2 ] 邹 勇,李明树,王 青.开放式实时系统的调度理论与方法分 系统[J]. 软件学报,2003,14(1):83-90. link1

Related Research