Resource Type

Journal Article 10

Year

2023 1

2022 1

2018 2

2017 2

2013 2

2010 1

Keywords

3D induced polarization 1

3D seismic method 1

Adverse geology 1

Bohai Strait tunnel 1

Comprehensive forward prospecting 1

Cutterhead layout 1

Cutting pattern 1

Disk cutters 1

Geological analysis 1

Group construction by TBM 1

Hard rock TBM tunnels 1

Horseshoe-shaped TBM 1

Non-circular TBMs 1

Rectangular pipe-jacking machine 1

Risk management and control 1

Super-long tunnels 1

TBM 1

TBM cutterhead design 1

TBM efficiency 1

TBM performance 1

open ︾

Search scope:

排序: Display mode:

The analysis of specific energy applied in Bohai Strait tunnel during TBM construction

Gao Pan,Zou Chong

Strategic Study of CAE 2013, Volume 15, Issue 12,   Pages 73-79

Abstract: proposed Bohai Strait tunnel is a challenging project, and penetration rate of tunnel boring machine (TBMDuring the construction of the Clem Jones tunnel, researchers made the analysis and forecasted about the TBM

Keywords: TBM     specific energy     drilling rate index     penetration rate    

Clogging of slurry-shield tunnel-boring machine drives in sedimentary soft rock: A case study

Frontiers of Structural and Civil Engineering doi: 10.1007/s11709-023-0984-8

Abstract: This paper presents a case study of the clogging of a slurry-shield tunnel-boring machine (TBM) experienceddue to special geological conditions, which had a considerably negative impact on the slurry-shield TBMIn this case study, the effect of clogging on the slurry-shield TBM tunneling performance (e.g., advance

Keywords: slurry-shield TBM     geological investigation     clogging     argillaceous siltstone     TBM performance     mitigation    

Challenges and Thoughts on Risk Management and Control for the Group Construction of a Super-Long Tunnel by TBM Article

Mingjiang Deng

Engineering 2018, Volume 4, Issue 1,   Pages 112-122 doi: 10.1016/j.eng.2017.07.001

Abstract: The main tunnel of the Ka–Shuang tunnel is divided into 18 tunnel-boring machine (TBM) sections

Keywords: Super-long tunnels     Group construction by TBM     Risk management and control     Technical measures    

QPSO-ILF-ANN-based optimization of TBM control parameters considering tunneling energy efficiency

Frontiers of Structural and Civil Engineering 2023, Volume 17, Issue 1,   Pages 25-36 doi: 10.1007/s11709-022-0908-z

Abstract: However, the TBM control parameters set based on operator experience may not necessarily be suitableHence, a method to optimize TBM control parameters using an improved loss function-based artificial neuralThe purpose of this method is to improve the TBM performance by optimizing the penetration and cutterheadResults show that, compared with the TBM operator and QPSO-ANN, the QPSO-ILF-ANN effectively increasesthe TBM penetration rate by 14.85% and 13.71%, respectively, and reduces the rock-breaking specific

Keywords: tunnel boring machine     control parameter optimization     quantum particle swarm optimization     artificial neural network     tunneling energy efficiency    

A Closer Look at the Design of Cutterheads for Hard Rock Tunnel-Boring Machines

Jamal Rostami, Soo-Ho Chang

Engineering 2017, Volume 3, Issue 6,   Pages 892-904 doi: 10.1016/j.eng.2017.12.009

Abstract:

The success of a tunnel-boring machine (TBM) in a given project depends on the functionality of all

Keywords: TBM cutterhead design     Cutterhead layout     Disk cutters     Cutting pattern     TBM efficiency    

Key Technologies and Applications of the Design and Manufacturing of Non-Circular TBMs

Jianbin Li

Engineering 2017, Volume 3, Issue 6,   Pages 905-914 doi: 10.1016/j.eng.2017.12.002

Abstract: and soil conditioning in loess strata for a rectangular pipe-jacking machine and a horseshoe-shaped TBM

Keywords: Non-circular TBMs     Rectangular pipe-jacking machine     Horseshoe-shaped TBM     Underground space exploitation    

The Practice of Forward Prospecting of Adverse Geology Applied to Hard Rock TBM Tunnel Construction: Article

Shucai Li, Lichao Nie, Bin Liu

Engineering 2018, Volume 4, Issue 1,   Pages 131-137 doi: 10.1016/j.eng.2017.12.010

Abstract: However, when a TBM encounters adverse geological conditions in the course of tunnel construction (e.gThis paper uses the TBM tunneling of the water conveyance project from Songhua River as a case studyorder to propose a comprehensive forward geological prospecting technical system that is suitable for TBMalso has reference value for carrying out the forward prospecting of adverse geology for potential TBMtunneling and for ensuring that a TBM can work efficiently.

Keywords: Hard rock TBM tunnels     Comprehensive forward prospecting     Geological analysis     3D induced polarization     3D    

The construct technology of tunnel and underground engineering in China

Wang Mengshu,Tan Zhongsheng

Strategic Study of CAE 2010, Volume 12, Issue 12,   Pages 4-10

Abstract: engineering, construction technique of drill blast method, the shield tunnel construction technique and TBM

Keywords: tunnel     underground engineering     design theory     drill-blast technique     shield tunnelling and TBM    

Construction risk estimation of TBM and discussion on key risk countermeasures of Bohai Strait tunnel

Li Da,Hong Kairong and Tan Zhongsheng

Strategic Study of CAE 2013, Volume 15, Issue 12,   Pages 95-100

Abstract: construction risks of Bohai Strait tunnel, including manufacturing of main bearing of tunnel boring machine (TBM

Keywords: Bohai Strait tunnel     analytic hierarchy process     fuzzy evaluation     risk estimation     risk countermeasure    

Realtime prediction of hard rock TBM advance rate using temporal convolutional network (TCN) with tunnel

Zaobao LIU; Yongchen WANG; Long LI; Xingli FANG; Junze WANG

Frontiers of Structural and Civil Engineering 2022, Volume 16, Issue 4,   Pages 401-413 doi: 10.1007/s11709-022-0823-3

Abstract: Real-time dynamic adjustment of the tunnel bore machine (TBM) advance rate according to the rock-machineinteraction parameters is of great significance to the adaptability of TBM and its efficiency in constructionThis paper proposes a real-time predictive model of TBM advance rate using the temporal convolutionalnetwork (TCN), based on TBM construction big data.The penetration rate and cutterhead torque of the current moment have significant influence on the TBM

Keywords: hard rock tunnel     tunnel bore machine advance rate prediction     temporal convolutional networks     soft computing     construction big data    

Title Author Date Type Operation

The analysis of specific energy applied in Bohai Strait tunnel during TBM construction

Gao Pan,Zou Chong

Journal Article

Clogging of slurry-shield tunnel-boring machine drives in sedimentary soft rock: A case study

Journal Article

Challenges and Thoughts on Risk Management and Control for the Group Construction of a Super-Long Tunnel by TBM

Mingjiang Deng

Journal Article

QPSO-ILF-ANN-based optimization of TBM control parameters considering tunneling energy efficiency

Journal Article

A Closer Look at the Design of Cutterheads for Hard Rock Tunnel-Boring Machines

Jamal Rostami, Soo-Ho Chang

Journal Article

Key Technologies and Applications of the Design and Manufacturing of Non-Circular TBMs

Jianbin Li

Journal Article

The Practice of Forward Prospecting of Adverse Geology Applied to Hard Rock TBM Tunnel Construction:

Shucai Li, Lichao Nie, Bin Liu

Journal Article

The construct technology of tunnel and underground engineering in China

Wang Mengshu,Tan Zhongsheng

Journal Article

Construction risk estimation of TBM and discussion on key risk countermeasures of Bohai Strait tunnel

Li Da,Hong Kairong and Tan Zhongsheng

Journal Article

Realtime prediction of hard rock TBM advance rate using temporal convolutional network (TCN) with tunnel

Zaobao LIU; Yongchen WANG; Long LI; Xingli FANG; Junze WANG

Journal Article