资源类型

期刊论文 2065

年份

2024 1

2023 132

2022 155

2021 132

2020 120

2019 114

2018 126

2017 121

2016 102

2015 125

2014 76

2013 82

2012 77

2011 85

2010 82

2009 68

2008 66

2007 79

2006 58

2005 43

展开 ︾

关键词

指标体系 12

系统工程 11

制造强国 8

微地震监测 8

三峡工程 7

可持续发展 7

开放的复杂巨系统 7

系统集成 7

钱学森 7

人工智能 6

技术体系 6

制造业 5

发展战略 5

汽车强国 5

系统科学 5

仿真 4

创新 4

战略性新兴产业 4

智能制造 4

展开 ︾

检索范围:

排序: 展示方式:

Overview of condition monitoring and operation control of electric power conversion systems in direct-drive

Shoudao HUANG, Xuan WU, Xiao LIU, Jian GAO, Yunze HE

《机械工程前沿(英文)》 2017年 第12卷 第3期   页码 281-302 doi: 10.1007/s11465-017-0442-1

摘要:

Electric power conversion system (EPCS), which consists of a generator and power converter, is one of the most important subsystems in a direct-drive wind turbine (DD-WT). However, this component accounts for the most failures (approximately 60% of the total number) in the entire DD-WT system according to statistical data. To improve the reliability of EPCSs and reduce the operation and maintenance cost of DD-WTs, numerous researchers have studied condition monitoring (CM) and fault diagnostics (FD). Numerous CM and FD techniques, which have respective advantages and disadvantages, have emerged. This paper provides an overview of the CM, FD, and operation control of EPCSs in DD-WTs under faults. After introducing the functional principle and structure of EPCS, this survey discusses the common failures in wind generators and power converters; briefly reviewed CM and FD methods and operation control of these generators and power converters under faults; and discussed the grid voltage faults related to EPCSs in DD-WTs. These theories and their related technical concepts are systematically discussed. Finally, predicted development trends are presented. The paper provides a valuable reference for developing service quality evaluation methods and fault operation control systems to achieve high-performance and high-intelligence DD-WTs.

关键词: direct-drive wind turbine     electric power conversion system     condition monitoring     fault diagnosis     operation control under faults     fault tolerance    

Application of AI techniques in monitoring and operation of power systems

David Wenzhong GAO, Qiang WANG, Fang ZHANG, Xiaojing YANG, Zhigang HUANG, Shiqian MA, Qiao LI, Xiaoyan GONG, Fei-Yue WANG

《能源前沿(英文)》 2019年 第13卷 第1期   页码 71-85 doi: 10.1007/s11708-018-0589-4

摘要: In recent years, the artificial intelligence (AI) technology is becoming more and more popular in many areas due to its amazing performance. However, the application of AI techniques in power systems is still in its infancy. Therefore, in this paper, the application potentials of AI technologies in power systems will be discussed by mainly focusing on the power system operation and monitoring. For the power system operation, the problems, the demands, and the possible applications of AI techniques in control, optimization, and decision making problems are discussed. Subsequently, the fault detection and stability analysis problems in power system monitoring are studied. At the end of the paper, a case study to use the neural network (NN) for power flow analysis is provided as a simple example to demonstrate the viability of AI techniques in solving power system problems.

关键词: power system operation and monitoring     artificial intelligence (AI)     deep learning     power flow analysis    

Optimal operation of integrated energy system including power thermal and gas subsystems

《能源前沿(英文)》 2022年 第16卷 第1期   页码 105-120 doi: 10.1007/s11708-022-0814-z

摘要: As a form of hybrid multi-energy systems, the integrated energy system contains different forms of energy such as power, thermal, and gas which meet the load of various energy forms. Focusing mainly on model building and optimal operation of the integrated energy system, in this paper, the dist-flow method is applied to quickly calculate the power flow and the gas system model is built by the analogy of the power system model. In addition, the piecewise linearization method is applied to solve the quadratic Weymouth gas flow equation, and the alternating direction method of multipliers (ADMM) method is applied to narrow the optimal results of each subsystem at the coupling point. The entire system reaches its optimal operation through multiple iterations. The power-thermal-gas integrated energy system used in the case study includes an IEEE-33 bus power system, a Belgian 20 node natural gas system, and a six node thermal system. Simulation-based calculations and comparison of the results under different scenarios prove that the power-thermal-gas integrated energy system enhances the flexibility and stability of the system as well as reducing system operating costs to some extent.

关键词: integrated energy system     power-to-gas     dist-flow     piecewise linearization     alternating direction method of multipliers (ADMM)    

Digital monitoring and health diagnosis for mechanical equipment operation safety based on fiber Bragg

Zude ZHOU, Desheng JIANG, Quan LIU

《机械工程前沿(英文)》 2009年 第4卷 第1期   页码 5-14 doi: 10.1007/s11465-009-0011-3

摘要: This paper introduces fiber Bragg grating (FBG) based on a fiber optic grating sensor developed to be embedded on mechanical equipment for digital monitoring and health diagnosis. The theoretical and experimental researches on the new-style FBG sensor (FBGS) technology, high-speed demodulation, and data transmission are discussed. The transmission characteristics between the FBG and the detection interface, modeling and compensation method for online distributed multi-parameter digital monitoring and methods for data processing, synchronous sampling, and long-term dynamic digital monitoring using embedded technology are also presented. The acquired information by an FBGS can be used for the optimization of maintenance schedules and refinement of mechanical equipment design. It is a challenge to gather real-time data from components working at high speed and in a severe environment of high temperature, high pressure, and high rotation speed. Currently, there are no sensors or technologies available for digital monitoring and health diagnosis under this rigorous situation for use in mechanical engineering operation safety. As a result, this paper introduces an online distributed and integrated digital monitoring system and health diagnosis. The new principle and new method will contribute to modern measurements in science and technology, mechanical engineering, and large mechanical equipment operation safety.

关键词: fiber Bragg grating sensor (FBGS)     mechanical equipment operation safety     embedded technology     high-speed demodulation     digital monitoring     health diagnosis    

Developing a power monitoring and protection system for the junction boxes of an experimental seafloor

Jun WANG,De-jun LI,Can-jun YANG,Zhi-feng ZHANG,Bo JIN,Yan-hu CHEN

《信息与电子工程前沿(英文)》 2015年 第16卷 第12期   页码 1034-1045 doi: 10.1631/FITEE.1500099

摘要: A power monitoring and protection system based on an embedded processor was designed for the junction boxes (JBs) of an experimental seafloor observatory network in China. The system exhibits high reliability, fast response, and high real-time performance. A two-step power management method which uses metal-oxide-semiconductor field-effect transistors (MOSFETs) and a mechanical contactor in series was adopted to generate a reliable power switch, to limit surge currents and to facilitate automatic protection. Grounding fault diagnosis and environmental monitoring were conducted by designing a grounding fault detection circuit and by using selected sensors, respectively. The data collected from the JBs must be time-stamped for analysis and for correlation with other events and data. A highly precise system time, which is necessary for synchronizing the times within and across nodes, was generated through the IEEE 1588 (precision clock synchronization protocol for networked measurement and control systems) time synchronization method. In this method, time packets were exchanged between the grandmaster clock at the shore station and the slave clock module of the system. All the sections were verified individually in the laboratory prior to a sea trial. Finally, a subsystem for power monitoring and protection was integrated into the complete node system, installed in a frame, and deployed in the South China Sea. Results of the laboratory and sea trial experiments demonstrated that the developed system was effective, stable, reliable, and suitable for continuous deep-sea operation.

关键词: Power monitoring and protection     Embedded processor     Seafloor observatory network     IEEE 1588     Junction boxes    

A reliable and practical reference objective for the deviation diagnosis of energy system parameters

Liping LI, Zheng LI,

《能源前沿(英文)》 2009年 第3卷 第4期   页码 440-445 doi: 10.1007/s11708-009-0051-8

摘要: The core objective to optimize a complex energy system is to set the reference target to guide the parameter adjustment of system operation. In this paper, a new case-based approach is proposed based on an online performance assessment program and its long-term operation data for a large power unit. The online model of a coal-fired power unit’s performance assessment is demonstrated, and the distribution pattern of the performance index is revealed by statistical analysis of the abundant data. The fundamental issues (representation of the similarity of two thermal processes, similarity measure, etc.) are tackled. The key sections and key parameters for the completion of similarity determination are proposed, which are essential to realize a case-based strategy. A full-scope simulator of power unit is used to test the availability of the method. The advantage of the case-based approach is the integrality of information over other methods.

关键词: energy system     case-based     optimization     power unit operation     performance    

Impact of renewable energies on the operation and economic situation of coal fired power stations: Actualsituation of coal fired power stations in Germany

Hans-Joachim KRAUTZ, Alexander LISK, Joachim POSSELT, Christian KATZER

《能源前沿(英文)》 2017年 第11卷 第2期   页码 119-125 doi: 10.1007/s11708-017-0468-4

摘要: Due to the fluctuating character of the renewable energy sources the demand of conventional power plants for flexibility is increasing. In the recent years, in Germany there has been a fast rise of production capacity of renewable energies, especially from wind turbines, photovoltaic installations, and biomass plants. The installed nominal power of wind turbines is actually (December 2016) 42 GW and of photovoltaic installations 40?GW. The renewable electric energy production in Germany is about 190?TWh/a, which represents a share of 33% of the yearly demand. The increased need for flexibility affects both the power gradients as well as the minimum load of conventional power plants. Due to this flexibility behaviour, conventional power plants are faced with problems concerning the durability of power plant components, corrosion, more maintenance effort and consequently the overall life expectancy. Another consequence of the increasing share of renewable energies is the decreasing full load operating hours, especially of coal fired and gas power plants. Along with decreasing revenues from the energy exchange market, coal fired power plants are faced with new economically challenges.

关键词: flexible load operation     minimal load     power gradients     power plant maintenance     corrosion     life expectancy    

Carbon emission impact on the operation of virtual power plant with combined heat and power system

Yu-hang XIA,Jun-yong LIU,Zheng-wen HUANG,Xu ZHANG

《信息与电子工程前沿(英文)》 2016年 第17卷 第5期   页码 479-488 doi: 10.1631/FITEE.1500467

摘要: A virtual power plant (VPP) can realize the aggregation of distributed generation in a certain region, and represent distributed generation to participate in the power market of the main grid. With the expansion of VPPs and ever-growing heat demand of consumers, managing the effect of fluctuations in the amount of available renewable resources on the operation of VPPs and maintaining an economical supply of electric power and heat energy to users have been important issues. This paper proposes the allocation of an electric boiler to realize wind power directly converted for supplying heat, which can not only overcome the limitation of heat output from a combined heat and power (CHP) unit, but also reduce carbon emissions from a VPP. After the electric boiler is considered in the VPP operation model of the combined heat and power system, a multi-objective model is built, which includes the costs of carbon emissions, total operation of the VPP and the electricity traded between the VPP and the main grid. The model is solved by the CPLEX package using the fuzzy membership function in Matlab, and a case study is presented. The power output of each unit in the case study is analyzed under four scenarios. The results show that after carbon emission is taken into account, the output of low carbon units is significantly increased, and the allocation of an electric boiler can facilitate the maximum absorption of renewable energy, which also reduces carbon emissions from the VPP.

关键词: Virtual power plant (VPP)     Carbon emissions     Electric boiler     Wind power     Combined heat and power (CHP)    

Applications of thermostatically controlled loads for demand response with the proliferation of variable renewable energy

Meng SONG, Wei SUN

《能源前沿(英文)》 2022年 第16卷 第1期   页码 64-73 doi: 10.1007/s11708-021-0732-5

摘要: More flexibility is desirable with the proliferation of variable renewable resources for balancing supply and demand in power systems. Thermostatically controlled loads (TCLs) attract tremendous attentions because of their specific thermal inertia capability in demand response (DR) programs. To effectively manage numerous and distributed TCLs, intermediate coordinators, e.g., aggregators, as a bridge between end users and dispatch operators are required to model and control TCLs for serving the grid. Specifically, intermediate coordinators get the access to fundamental models and response modes of TCLs, make control strategies, and distribute control signals to TCLs according the requirements of dispatch operators. On the other hand, intermediate coordinators also provide dispatch models that characterize the external characteristics of TCLs to dispatch operators for scheduling different resources. In this paper, the bottom-up key technologies of TCLs in DR programs based on the current research have been reviewed and compared, including fundamental models, response modes, control strategies, dispatch models and dispatch strategies of TCLs, as well as challenges and opportunities in future work.

关键词: thermostatically controlled load     demand response     renewable energy     power system operation    

Study of operation optimization based on data mining technique in power plants

LI Jianqiang, LIU Jizhen, GU Junjie, NIU Chenglin

《能源前沿(英文)》 2007年 第1卷 第4期   页码 457-462 doi: 10.1007/s11708-007-0067-1

摘要: The determination of operation optimization value is very important for economic analysis and operation optimization in power plants. The operation optimization value determined by traditional methods usually cannot reflect the ac

关键词: traditional     optimization     determination     economic analysis     important    

电动商用车系统工程技术体系及关键技术研究

孙逢春,何洪文

《中国工程科学》 2018年 第20卷 第1期   页码 59-67 doi: 10.15302/J-SSCAE-2018.01.009

摘要:

发展新能源汽车是世界共识,以纯电驱动为特点的新能源汽车被确定为我国的战略性新兴产业和“中国制造2025”重点领域。本文对我国电动商用车发展的历程和技术路线、特点等进行了综述,结合北京奥运会“零排放区24 h不间断安全运行”的需求背景,系统提出并明确了“电动商用车系统工程”的内涵,就其三大核心组成要素“电动商用车平台、充/换电站、运营监控”及其关键技术,分别进行了研究分析。最后,针对我国新能源汽车2020年500万辆级规模应用和2022年北京冬季奥林匹克运动会–25 ℃环境下的应用需求,探讨了电动商用车系统工程体系化升级的抓手,目标是真正实现纯电动商用车“性能优越、技术无短板、推广应用无禁区”。

关键词: 电动商用车     充/换电站     运营监控     系统工程     冬季奥林匹克运动会    

电缆测温系统在工厂供配电系统中的应用

阎红

《中国工程科学》 2007年 第9卷 第11期   页码 172-174

摘要:

探讨了在工矿企业中10kV高压电力电缆在线运行温度检测的必要性与实际应用;列举了感温元件 的选型方法以及温度监测系统的组成与运行;介绍了信息处理软件和故障诊断专家系统软件、电力设备底层 信息网、现场总线技术在电力系统中的应用;实现了不停电状态下对高压电缆及电缆接头等各种电缆的故障 在线监测及诊断功能。

关键词: 10kV高压电力电缆     终端头     温度传感器     监测系统    

Design and realization of a remote monitoring and diagnosis and prediction system for large rotating

Shaohong WANG, Tao CHEN, Jianghong SUN

《机械工程前沿(英文)》 2010年 第5卷 第2期   页码 165-170 doi: 10.1007/s11465-009-0090-1

摘要: Traditional on-site fault diagnosis means cannot meet the needs of large rotating machinery for its performance and complexity. Remote monitoring and diagnosis technology is a new fault diagnosis mode combining computer technology, communication technology, and fault diagnosis technology. The designed remote monitoring and diagnosis and prediction system for large rotating machinery integrates the distributed resources in different places and breaks through shortcomings as the offline and decentralized information. The system can make further implementation of equipment prediction technology research based on condition monitoring and fault diagnosis, provide on-site analysis results, and carry out online actual verification of the results. The system monitors real-time condition of the equipment and achieves early fault prediction with great significance to guarantee safe operation, saves maintenance costs, and improves utilization and management of the equipment.

关键词: large rotating machinery     remote monitoring     fault diagnosis     prediction system    

Estimation and optimization operation in dealing with inflow and infiltration of a hybrid sewerage system

Mingkai Zhang, He Jing, Yanchen Liu, Hanchang Shi

《环境科学与工程前沿(英文)》 2017年 第11卷 第2期 doi: 10.1007/s11783-017-0912-z

摘要: Inflow and infiltration of a sewage system was estimated by synthetic model. Homological feature of catchments was recognized by self-organizing map. Occurrence risk index was proposed to assess catchment operation problem. Optimal strategy was used to reduce surcharge events and improve effluent quality. Inflow and infiltration (I/I) are serious problems in hybrid sewerage systems. Limited sewerage information impedes the estimation accuracy of I/I for each system catchment because of its unknown distribution. A new method proposed to deal with I/I of a large-scale hybrid sewerage system with limited infrastructure facility data is presented in this study. The catchment of representative pump stations was adopted to demonstrate the homological catchments that have similar wastewater fluctuation characteristics. Homological catchments were clustered using the self-organizing map (SOM) analysis based on long-term daily flow records of 50 pumping stations. An assessment index was applied to describe the I/I and overflow risk of representative pump stations in the catchment based on the hourly wastewater quality and quantity data. The potential operational strategy of homological catchments was generated by the assessment index of representative pump stations. The simulation results of the potential operational strategy indicated that the optimized operation strategy could reduce surcharge events and significantly improve the quality of wastewater treatment plant effluent.

关键词: Hybrid sewerage system     Wastewater treatment plant     Optimization operation     Inflow     Infiltration    

高比例新能源并网与运行发展研究

石文辉,屈姬贤,罗魁,李钦淼,何永君,王伟胜

《中国工程科学》 2022年 第24卷 第6期   页码 52-63 doi: 10.15302/J-SSCAE-2022.07.006

摘要:

大力发展新能源是我国实现碳达峰、碳中和战略目标,加速能源结构绿色低碳转型的刚性需求与必由之路。本文在调研分析我国新能源发展现状和趋势的基础上,展望了我国中期(2030年)、远期(2060年)高比例新能源并网场景;阐述了高比例新能源并网与运行面临的高效消纳与能源保障难题并存、安全稳定运行难度剧增、电力市场机制不适应等挑战;从电源侧、电网侧、负荷侧、储能及基础支撑4个方面,全面分析了高比例新能源并网与运行关键技术体系。着眼我国高比例新能源并网与运行的长期稳健发展,提出了加强协调规划、提升灵活平衡能力,强化技术攻关、突破关键技术体系,建立衔接机制、支撑新能源参与市场,深化市场设计、适应新能源消纳场景等建议,可为电力领域规划、电力技术研究提供基础参考。

关键词: 高比例新能源     并网与运行     新能源消纳     电力市场     技术体系    

标题 作者 时间 类型 操作

Overview of condition monitoring and operation control of electric power conversion systems in direct-drive

Shoudao HUANG, Xuan WU, Xiao LIU, Jian GAO, Yunze HE

期刊论文

Application of AI techniques in monitoring and operation of power systems

David Wenzhong GAO, Qiang WANG, Fang ZHANG, Xiaojing YANG, Zhigang HUANG, Shiqian MA, Qiao LI, Xiaoyan GONG, Fei-Yue WANG

期刊论文

Optimal operation of integrated energy system including power thermal and gas subsystems

期刊论文

Digital monitoring and health diagnosis for mechanical equipment operation safety based on fiber Bragg

Zude ZHOU, Desheng JIANG, Quan LIU

期刊论文

Developing a power monitoring and protection system for the junction boxes of an experimental seafloor

Jun WANG,De-jun LI,Can-jun YANG,Zhi-feng ZHANG,Bo JIN,Yan-hu CHEN

期刊论文

A reliable and practical reference objective for the deviation diagnosis of energy system parameters

Liping LI, Zheng LI,

期刊论文

Impact of renewable energies on the operation and economic situation of coal fired power stations: Actualsituation of coal fired power stations in Germany

Hans-Joachim KRAUTZ, Alexander LISK, Joachim POSSELT, Christian KATZER

期刊论文

Carbon emission impact on the operation of virtual power plant with combined heat and power system

Yu-hang XIA,Jun-yong LIU,Zheng-wen HUANG,Xu ZHANG

期刊论文

Applications of thermostatically controlled loads for demand response with the proliferation of variable renewable energy

Meng SONG, Wei SUN

期刊论文

Study of operation optimization based on data mining technique in power plants

LI Jianqiang, LIU Jizhen, GU Junjie, NIU Chenglin

期刊论文

电动商用车系统工程技术体系及关键技术研究

孙逢春,何洪文

期刊论文

电缆测温系统在工厂供配电系统中的应用

阎红

期刊论文

Design and realization of a remote monitoring and diagnosis and prediction system for large rotating

Shaohong WANG, Tao CHEN, Jianghong SUN

期刊论文

Estimation and optimization operation in dealing with inflow and infiltration of a hybrid sewerage system

Mingkai Zhang, He Jing, Yanchen Liu, Hanchang Shi

期刊论文

高比例新能源并网与运行发展研究

石文辉,屈姬贤,罗魁,李钦淼,何永君,王伟胜

期刊论文