Journal Home Online First Current Issue Archive For Authors Journal Information 中文版

Strategic Study of CAE >> 2009, Volume 11, Issue 3

Sutong Bridge—a cable-stayed bridge with main span of 1 088 meters

1. Jiangsu Provincial Sutong Bridge Construction Commanding Department, Nanjing 210006, China;

2. CCCC Highway Consultants Co., Ltd., Beijing 100088, China

Funding project:国家科技支撑计划资助项目(2006BAG04B06) Received: 2008-11-01 Available online: 2009-03-10 14:37:05.000

Next Previous

Abstract

In this paper, design and construction concepts are briefly presented. Furthermore, key technologies and innovative achievements are summarized mainly on piled foundation bearing capacity analysis, river bed scour protection and monitoring, superstructure wind-resistance study, mid-span closure method as well as long cantilever structure construction control.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

图10

图11

图12

图13

References

[ 1 ] 游庆仲,董学武,吴寿昌,等.苏通大桥基础工程的挑战与创新[J].中国工程科学,2007,6(9):22-26 link1

[ 2 ] 华锡生,黄腾.精密工程测量技术与应用[M].南京:河海大学出版社,2001

[ 3 ] 向中实.桥梁施工控制技术[M].北京:人民交通出版社,2001

Related Research