Risk Severity Analysis of Scheme of River Closure by End Dumping
He Changhai,Hu Zhigen,Zhou Yihong,Xiao Huanxiong,Fu Zheng,Li Dingkui
Strategic Study of CAE 2002, Volume 4, Issue 4, Pages 58-63
According to comprehensive analysis of river closure risk, a summary of two kinds of reasonable riskvariables and models characteristic of high drop and high flow velocity in river closure project areThis paper also puts forward the specific methods and procedures to calculate river closure risk probabilityBased on the case study and, evaluation and treatment of river closure risk are further analyzed.suggestion of reasonable risk severity is given that lays a basic foundation for risk decision of river closure
Keywords: river closure by end dumping scheme of river closure standard of river closure risk probability risk
Closure technique for the hybrid girder cable-stayed bridge of Edong Bridge
Liu Minghu,Tan Hao,Xu Guoping,Zhao Canhui
Strategic Study of CAE 2011, Volume 13, Issue 10, Pages 99-104
Keywords: Edong Bridge hybrid girder cable-stayed bridge closure technique loading assistant closure method
D. N. SAULOV, C. R. CHODANKA, M. J. CLEARY, A. Y. KLIMENKO
Frontiers of Chemical Science and Engineering 2012, Volume 6, Issue 1, Pages 84-93 doi: 10.1007/s11705-011-1164-2
Keywords: gasification CO2 capture PCMC RPM
Zhou-Fang XIONG MD, Wei-Hong DONG MD, Ze-Hua WANG MD,
Frontiers of Medicine 2010, Volume 4, Issue 1, Pages 112-116 doi: 10.1007/s11684-010-0016-7
Keywords: cervical cancer radical surgery peritoneum subcutaneous tissue
Tong Dawei
Strategic Study of CAE 2011, Volume 13, Issue 12, Pages 80-83
In this paper, 3D simulation model for the river closure is establishedWith the analysis of the dynamic hydraulic characteristics at the closure-gap, a VR-based 3D dynamicvisual-simulation of method for the complex process of river closure is presented.In this visual epresentation, comparison among different schemes of river closure is achieved easily.Therefore, a powerful visual tool for aiding river closure design and management can be provided.
Keywords: virtual reality river closure three-dimensional dynamic visual simulation
Research on Bifurcation Property of Dike Rockfill of River Closure by End Dumping
He Changhai,Xiao Huanxiong,Hu Zhigen,Zhou Yihong
Strategic Study of CAE 2001, Volume 3, Issue 6, Pages 69-74
Keywords: river closure by end dumping slump static bifurcation singularity theory
Assistant pullback technology for main span closure of Sutong Bridge
Chen Ming,Luo Chengbin,Wu Qihe,Zhang Yongtao,You Xinpeng
Strategic Study of CAE 2009, Volume 11, Issue 3, Pages 75-80
By abstracting the advantage of the pullback method abroad and the deomestric temperature-cutting method, a new assistant pullback method is put forward and brought into practice actually. In this paper, the analysis key point of practice conditions, key parameter of practice, main measures of the method and the performance are introduced.
Keywords: Sutong Bridge assistant pullback middle span closure geometric control method construction technology
Study on anti crack design method for laminating crack at bottom slab in closure segment
Lin Haifeng,Zhang Dongdong and Zhao Qilin
Strategic Study of CAE 2012, Volume 14, Issue 5, Pages 106-112
Keywords: bridge engineering bottom slab finite element method failure criterion biaxial stress
Innovation of Management and Science and Technology in Phase I Construction of TGP
Dai Huichao,Cao Guangjing
Strategic Study of CAE 2005, Volume 7, Issue 1, Pages 50-59
Keywords: Three Gorges dam hydropower station ship lock generating set river closure management
Yao Qingtao,Pan Guilin,Yao Qingtao,He Chaoran
Strategic Study of CAE 2013, Volume 15, Issue 8, Pages 54-59
Unlike single-span suspension bridge,the three -span continuous suspension bridge is mainly characterized by slings set in both side spans, and the continuous transition of stiffening girders between the mid and side spans achieved by girders without slings in the main tower region, and usually restraint equipments set on the side span transition piers to achieve the coordinated deformation between the main cables and stiffening girders in the region, so the lifting method and key construction process for the stiffening girders of the type of suspension bridge is relatively complex. the Fourth Nanjing Yangtze River Bridge as the background, and according to the structural features of the large span three-span continuous suspension bridge, the reasonable lifting program is determined through the comparison and analysis on two different types of lifting sequence for steel box girders.
Keywords: three-span continuous suspension bridge steel box girder lifting program closure saddle pushing
Construction Practice and Innovation of “Deep Sea One” Energy Station
You Xuegang , Zhou Shouwei , Zhang Xiulin , Liu Kongzhong , Xu Huakui , Liu Xinyu , Zeng Dong
Strategic Study of CAE 2022, Volume 24, Issue 3, Pages 66-79 doi: 10.15302/J-SSCAE-2022.03.008
The “Deep Sea One” energy station is the first ultra-deep-water large-scale gas field that is independently explored and developed by China and its proven reserves of natural gas exceed hundreds of billions of cubic meters. This energy station is also the first 100 000-ton deep-water semi-submersible production, storage, and offloading platform worldwide; it adopts a whole sea development mode that integrates a semi-submersible production, storage, and offloading platform, a subsea production system, and submarine pipelines. Moreover, the energy station is built by conducting independent design, optimizing organization and management, and strengthening technical research and innovation. This paper first reviews the construction background and challenges, introduces the optimization and breakthroughs of the development modes of deep-water gas fields, and then summarizes the major technological breakthroughs and experiences during the design and construction of this energy station, including oil storage in columns of semi-submersible platforms, load lateral transfer of super-tonnage open structures via pre-inclination and return, and half-floating integrated precisely of super large structures. This study is hoped to provide a useful reference for efficient development of deep-water and ultra-deep-water oil and gas fields and for high-level construction of semi-submersible platforms.
Keywords: ultra-deep water semi-submarine energy station oil storage in column lateral transfer half-floating closure
Title Author Date Type Operation
Risk Severity Analysis of Scheme of River Closure by End Dumping
He Changhai,Hu Zhigen,Zhou Yihong,Xiao Huanxiong,Fu Zheng,Li Dingkui
Journal Article
Closure technique for the hybrid girder cable-stayed bridge of Edong Bridge
Liu Minghu,Tan Hao,Xu Guoping,Zhao Canhui
Journal Article
Coupling the porous conditional moment closure with the random pore model: applications to gasification
D. N. SAULOV, C. R. CHODANKA, M. J. CLEARY, A. Y. KLIMENKO
Journal Article
Non-closure of the peritoneum and subcutaneous tissue at radical hysterectomy: A randomized controlled
Zhou-Fang XIONG MD, Wei-Hong DONG MD, Ze-Hua WANG MD,
Journal Article
Research on dynamic visual simulation for construction process of river closure project based on virtual
Tong Dawei
Journal Article
Research on Bifurcation Property of Dike Rockfill of River Closure by End Dumping
He Changhai,Xiao Huanxiong,Hu Zhigen,Zhou Yihong
Journal Article
Assistant pullback technology for main span closure of Sutong Bridge
Chen Ming,Luo Chengbin,Wu Qihe,Zhang Yongtao,You Xinpeng
Journal Article
Study on anti crack design method for laminating crack at bottom slab in closure segment
Lin Haifeng,Zhang Dongdong and Zhao Qilin
Journal Article
Innovation of Management and Science and Technology in Phase I Construction of TGP
Dai Huichao,Cao Guangjing
Journal Article
Study on overall lifting program for steel box girder of large span of three-span continuous suspension bridge
Yao Qingtao,Pan Guilin,Yao Qingtao,He Chaoran
Journal Article