Study on overall lifting program for steel box girder of large span of three-span continuous suspension bridge

1. CCCC Second Harbour Engineering Company LTD., Wuhan 430040, China;

2. National Engineering Research Center of Highway Bridges, Beijing 100088, China;

3. Key Laboratory in Communications Industry for Construction Technologies of Long and Large Bridge, Wuhan 430040, China

Received: 2013-05-22 Available online: 2013-08-28 09:00:40.000

Next Previous

Abstract

Unlike single-span suspension bridge,the three -span continuous suspension bridge is mainly characterized by slings set in both side spans, and the continuous transition of stiffening girders between the mid and side spans achieved by girders without slings in the main tower region, and usually restraint equipments set on the side span transition piers to achieve the coordinated deformation between the main cables and stiffening girders in the region, so the lifting method and key construction process for the stiffening girders of the type of suspension bridge is relatively complex. the Fourth Nanjing Yangtze River Bridge as the background, and according to the structural features of the large span three-span continuous suspension bridge, the reasonable lifting program is determined through the comparison and analysis on two different types of lifting sequence for steel box girders.

Figures

图1

图2

图3

图4

图5

图6

图7

图8

图9

图10

图11

图12

References

[ 1 ] 周孟波,刘自明,王邦楣. 悬索桥手册[M].北京:人民交通出版 社,2003.

[ 2 ] 王 峻,梁进达. 泰州大桥悬索主桥钢箱梁吊装施工顺序的确 定[J]. 中国工程科学,2012,14(5):41-45. link1

[ 3 ] 冯兆祥,蒋 波. 特大跨径悬索桥上部结构施工关键技术研究 [J]. 土木工程学报,2007,40(4):32-37. link1

[ 4 ] 韦世国,吴建强,文 武,等. 润扬大桥悬索桥钢箱梁吊装技术 [J]. 桥梁建设,2004(4):40-43. link1

[ 5 ] 钟继卫. 大跨度悬索桥钢箱梁吊装精细化分析[J]. 桥梁建设, 2010(6):9-12. link1

[ 6 ] 姜 军,忻刚明,孙胜江. 大跨悬索桥加劲梁吊装阶段的施工控 制[J]. 公路,2009(12):35-39. link1

Related Research